Zhaohui Liu 0001

dblp:05/5317-1 · DBLP profile ↗
← Back
38ranked-venue papers
4as first author
15since 2021 · last 2026
0000-0003-1215-7622ORCID · conflict

Domains — the database's venue-derived domains; a paper can count in several

Theory of computation · 33 · 4 first-author · 12 since 2021Databases, data management, data science and information retrieval · 7 · 2 first-author · 2 since 2021Artificial intelligence and machine learning · 4 · 3 since 2021Computer networks · 1
YearPublicationVenuePosition
2026 Improved Algorithms for the Maximum Weight Star Packing Problem
Zhaohui Liu 0001, Wei Yu 0011, An Zhang
COCOON3
2026 Approximation algorithms for the capacitated min-max and minimum graph cover problems
Jiafeng Xiong, Zhaohui Liu 0001, Wei Yu 0011
Theor. Comput. Sci.2
2025 An Improved Approximation Algorithm for the Minimum k-Star Partition Problem
Wei Yu 0011, Zhaohui Liu 0001
COCOON (1)3
2025 Approximating Graphic Min-Max and Minimum Cycle/Path/Tree Cover Problems
Wei Yu 0011, Zhaohui Liu 0001
Discret. Appl. Math.2
2024 Approximation Algorithms for the Minimum Weight Cycle/Path Partition Problem
Wei Yu 0011, Zhaohui Liu 0001
AAIM (1)3
2024 Approximation Algorithms for the Capacitated Min-Max and Minimum Graph Cover Problems
Jiafeng Xiong, Zhaohui Liu 0001, Wei Yu 0011
COCOA (1)2
2024 Approximating the Maximum Weight Cycle/Path Partition in Graphs with Weights One and Two
Xinmeng Guo, Wei Yu 0011, Zhaohui Liu 0001
COCOON (1)3
2024 Approximation Algorithms for the Min-Max Mixed Rural Postmen Cover Problem and Its Variants
Liting Huang, Wei Yu 0011, Zhaohui Liu 0001
Algorithmica3
2024 Improved approximation algorithms for the k-path partition problem
Wei Yu 0011, Zhaohui Liu 0001
J. Glob. Optim.3
2023 Exact and Approximation Algorithms for the Multi-depot Data Mule Scheduling with Handling Time and Time Span Constraints
Minqin Liu, Wei Yu 0011, Zhaohui Liu 0001, Xinmeng Guo
COCOA (1)3
2022 Approximation Algorithms for the Min-Max Mixed Rural Postmen Cover Problem and Its Variants
Liting Huang, Wei Yu 0011, Zhaohui Liu 0001
COCOON3
2022 Approximation algorithms for some Minimum Postmen Cover Problems
Yuying Mao, Wei Yu 0011, Zhaohui Liu 0001, Jiafeng Xiong
Discret. Appl. Math.3
2022 Approximation and polynomial algorithms for the data mule scheduling with handling time and time span constraints
Wei Yu 0011, Zhaohui Liu 0001
Inf. Process. Lett.2
2022 An asymptotically tight online algorithm for m-Steiner Traveling Salesman Problem
Yubai Zhang, Zhao Zhang 0002, Zhaohui Liu 0001, Qirong Chen
Inf. Process. Lett.3
2021 Approximation Algorithms for Some Min-Max and Minimum Stacker Crane Cover Problems
Yuhui Sun, Wei Yu 0011, Zhaohui Liu 0001
COCOA3
2020 New LP relaxations for Minimum Cycle/Path/Tree Cover Problems
Wei Yu 0011, Zhaohui Liu 0001, Xiaoguang Bao
Theor. Comput. Sci.2
2019 Approximation Algorithms for Some Minimum Postmen Cover Problems
Yuying Mao, Wei Yu 0011, Zhaohui Liu 0001, Jiafeng Xiong
COCOA3
2019 Distance Constrained Vehicle Routing Problem to Minimize the Total Cost
Wei Yu 0011, Zhaohui Liu 0001, Xiaoguang Bao
COCOON2
2019 New approximation algorithms for the minimum cycle cover problem
Wei Yu 0011, Zhaohui Liu 0001, Xiaoguang Bao
Theor. Comput. Sci.2
2018 New LP Relaxations for Minimum Cycle/Path/Tree Cover Problems
Wei Yu 0011, Zhaohui Liu 0001, Xiaoguang Bao
AAIM2
2017 Better Inapproximability Bounds and Approximation Algorithms for Min-Max Tree/Cycle/Path Cover Problems
Wei Yu 0011, Zhaohui Liu 0001
COCOON2
2017 A note on approximation algorithms of the clustered traveling salesman problem
Xiaoguang Bao, Zhaohui Liu 0001, Wei Yu 0011, Ganggang Li
Inf. Process. Lett.2
2016 Semi-online scheduling with bounded job sizes on two uniform machines
Zhaohui Liu 0001
Theor. Comput. Sci.2
2016 Improved approximation algorithms for some min-max and minimum cycle cover problems
Wei Yu 0011, Zhaohui Liu 0001
Theor. Comput. Sci.2
2015 Improved Approximation Algorithms for Min-Max and Minimum Vehicle Routing Problems
Wei Yu 0011, Zhaohui Liu 0001
COCOON2
2015 Online scheduling with equal processing times and machine eligibility constraints
Zhaohui Liu 0001
Theor. Comput. Sci.2
2013 Semi-online scheduling problems on two uniform machines under a grade of service provision
Xinrong Lu, Zhaohui Liu 0001
Theor. Comput. Sci.2
2012 An improved approximation algorithm for the clustered traveling salesman problem
Xiaoguang Bao, Zhaohui Liu 0001
Inf. Process. Lett.2
2012 Approximation algorithms for single vehicle scheduling problems with release and service times on a tree or cycle
Xiaoguang Bao, Zhaohui Liu 0001
Theor. Comput. Sci.2
2011 Single-vehicle scheduling problems with release and service times on a line
abstract
We consider the following vehicle scheduling problem. There are some customers on a line that will be served by a single vehicle. Each customer is associated with a release time and a service time. The objective is to schedule the vehicle to minimize the makespan. For the tour version, where the makespan means the time when the vehicle has served all customers and returned back to its initial location, we present a 3/2-approximation algorithm. For the path version, where the makespan is defined as the time by which the last customer has been served completely, we present a 5/3-approximation algorithm. © 2010 Wiley Periodicals, Inc. NETWORKS, Vol. 57(2), 128–134 2011
Wei Yu 0011, Zhaohui Liu 0001
Networks2
2011 Semi-online scheduling with known partial information about job sizes on two identical machines
Zhaohui Liu 0001, T. C. E. Cheng
Theor. Comput. Sci.2
2010 Online scheduling with reassignment on two uniform machines
Zhaohui Liu 0001
Theor. Comput. Sci.2
2005 Approximation schemes for minimizing total (weighted) completion time with release dates on a batch machine
Zhaohui Liu 0001, T. C. E. Cheng
Theor. Comput. Sci.1
2004 The unbounded single machine parallel batch scheduling problem with family jobs and release dates to minimize makespan
Jinjiang Yuan, Zhaohui Liu 0001, Chi To Ng 0001, T. C. E. Cheng
Theor. Comput. Sci.2
2003 3/2-approximation for two-machine no-wait flowshop scheduling with availability constraints
T. C. E. Cheng, Zhaohui Liu 0001
Inf. Process. Lett.2
2002 Scheduling with job release dates, delivery times and preemption penalties
Zhaohui Liu 0001, T. C. E. Cheng
Inf. Process. Lett.1
2000 Scheduling one batch processor subject to job release dates
Zhaohui Liu 0001, Wenci Yu
Discret. Appl. Math.1
1999 Scheduling Groups of Unit Length Jobs on Two Identical Parallel Machines
Zhaohui Liu 0001, Wenci Yu, T. C. E. Cheng
Inf. Process. Lett.1