Demonstration venue · read-only. Every page can be browsed; the buttons that would change it are switched off. Create an account to run TaxoReview on your own data. A simulation from public publication records: the people listed were not invited and did not agree to review.
? Tutorial for this page

Robert J. Bergeron

dblp:116/7048 · DBLP profile ↗
← Back
1ranked-venue papers
1as first author
0since 2021 · last 1998
—ORCID · none

Domains — the database's venue-derived domains; a paper can count in several

Systems, architecture and hardware · 1 · 1 first-author

Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.

Computer architecture, parallel and distributed computing, and storage systems
1 paper
Performance modeling and evaluation · 87% High-performance computing · 13%

Topics — the 3 heaviest of 3, each with the papers that count most for it

TopicWeightPapersLastEvidence papers
Performance modeling and evaluation › performance monitoring
hardware performance monitoring
0.011998
Measurement of a Scientific Workload using the IBM Hardware Performance Monitor · SC 1998
Performance modeling and evaluation
workload characterization
0.011998
Measurement of a Scientific Workload using the IBM Hardware Performance Monitor · SC 1998
High-performance computing › scientific computing
scientific workload
0.011998
Measurement of a Scientific Workload using the IBM Hardware Performance Monitor · SC 1998
YearPublicationVenuePosition
1998 Measurement of a Scientific Workload using the IBM Hardware Performance Monitor
abstract
This paper presents data on the performance of the NAS SP2 IBM system using RS6000 hardware monitors and a performance measurement tool. The data collected showed that the SP2 averages about 1.3 Gflops, about 3% of peak. The report provides the relative usage for the various hardware units over the entire workload measured over a 9-month period. The workload displays moderate parallelism, with the most popular choice of nodes as 16. Although the monitor data provide a good snapshot of workload performance, causal correlations regarding key performance indicators appear difficult to draw from the current data due to the absence of I/O delay measurements.
Robert J. Bergeron
SC1