VLDB 2026 Research / reviewers in the wild / expert
Houssine Chetto
dblp:13/3774
· DBLP profile ↗
3ranked-venue papers
3as first author
0since 2021 · last 1990
—ORCID · none
Domains — the database's venue-derived domains; a paper can count in several
Systems, architecture and hardware · 1 · 1 first-authorSoftware engineering, systems software and programming languages · 1 · 1 first-authorDatabases, data management, data science and information retrieval · 1 · 1 first-authorTheory of computation · 1 · 1 first-author
Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.
| Computer architecture, parallel and distributed computing, and storage systems
1 paper |
Embedded and real-time systems · 100% |
Topics — the 3 heaviest of 3, each with the papers that count most for it
| Topic | Weight | Papers | Last | Evidence papers |
|---|---|---|---|---|
Embedded and real-time systems › real-time scheduling › deadline scheduling
EDF scheduling |
0.0 | 1 | 1989 | Some Results of the Earliest Deadline Scheduling Algorithm · IEEE Trans. Software Eng. 1989 |
Embedded and real-time systems
real-time scheduling |
0.0 | 1 | 1989 | Some Results of the Earliest Deadline Scheduling Algorithm · IEEE Trans. Software Eng. 1989 |
Embedded and real-time systems › real-time scheduling
fault-tolerant real-time scheduling |
0.0 | 1 | 1989 | Some Results of the Earliest Deadline Scheduling Algorithm · IEEE Trans. Software Eng. 1989 |
Methods — techniques the papers use, named apart from their topics
schedulability analysis · 0.0
| Year | Publication | Venue | Position |
|---|---|---|---|
| 1990 | Dynamic Scheduling of Real-Time Tasks under Precedence Constraints
Houssine Chetto, Maryline Chetto, T. Bouchentouf |
Real Time Syst. | 1 |
| 1989 | Scheduling Periodic and Sporadic Tasks in a Real-Time System
Houssine Chetto, Maryline Chetto |
Inf. Process. Lett. | 1 |
| 1989 | Some Results of the Earliest Deadline Scheduling AlgorithmabstractAbmw&-Task scheduling is an important issue in the design of a renl-timc computer system because tasks have execution deadlines that must be met, otherwise the system fails with severe consequences upon the environment. In this paper, we study the problem of scheduling periodic time critical tasks on a monoprocessor system. A periodic time critkal task consists of an infinite number of -quests, each of whieh has a prescribed deadline. Tasks are assumed to meet their timing requirements when scheduled by the Earliest Deadline algorithm and preemptions are allowed. We report results from some investigations into the problem of making optimum use of the remaining processor idle time in scheduling perlodk tasks either as soon as possible M as late as possible. The major results consist of the statement and proof of properties relating to bcdhtion and duration of idle time intervals and enable us to provide an elRcient algorlthm lor determining maximum quantity of total idle time available between any two instants. We describe how these results can be applied, Brst to the decision problem that arises when a sporadic time critical task occurs and requires to be run at an unpredictable time and second, to the scheduling problem that arises in a fault tolerant system using the deadline mechanism for which each task implements primary and alternate algorithms. Index Terms-Deadline mechanism, idle time, preemptive schedul Houssine Chetto, Maryline Chetto |
IEEE Trans. Software Eng. | 1 |