Demo Data from VLDB 2026 / reviewers in the wild / expert
Natasha Nigar
dblp:204/3825
· DBLP profile ↗
1ranked-venue papers
1as first author
0since 2021 · last 2017
0000-0002-6517-666XORCID · reported
Domains — the database's venue-derived domains; a paper can count in several
Software engineering, systems software and programming languages · 1 · 1 first-author
Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.
| Software engineering, system software, and programming languages
1 paper |
Empirical software engineering · 100% |
Topics — the 2 heaviest of 2, each with the papers that count most for it
| Topic | Weight | Papers | Last | Evidence papers |
|---|---|---|---|---|
Empirical software engineering › software project management
software project scheduling |
0.3 | 1 | 2017 | Model-based dynamic software project scheduling · ESEC/SIGSOFT FSE 2017 |
Empirical software engineering
agile software development |
0.1 | 1 | 2017 | Model-based dynamic software project scheduling · ESEC/SIGSOFT FSE 2017 |
Methods — techniques the papers use, named apart from their topics
multi-objective optimization · 0.3mathematical optimization · 0.3
| Year | Publication | Venue | Position |
|---|---|---|---|
| 2017 | Model-based dynamic software project schedulingabstractSoftware project scheduling, under uncertain and dynamic environments, is one of the most important challenges in software engineering. Recent studies addressed this challenge in both static and dynamic scenarios for small and medium size software projects. The increasing trend of cloud based software solutions (large scale software projects) needs agility not only for sustainable maintenance but also for in time and within budget completion. Therefore, this paper formulates software project scheduling problem (SPSP) as an optimization problem under uncertainties and dynamics for hybrid scRUmP software model. In this regard, a mathematical model is constructed with five objectives as project duration, task fragmentation, robustness, cost, and stability. Natasha Nigar |
ESEC/SIGSOFT FSE | 1 |