Demo Data from VLDB 2026 / reviewers in the wild / expert
Liwei Qi
dblp:21/4600
· DBLP profile ↗
2ranked-venue papers
0as first author
0since 2021 · last 2015
—ORCID · none
Domains — the database's venue-derived domains; a paper can count in several
Artificial intelligence and machine learning · 2Systems, architecture and hardware · 2
Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.
| Artificial intelligence
1 paper |
Motion planning and robot control · 77% Efficient and distributed learning · 23% |
Topics — the 1 heaviest of 2, each with the papers that count most for it
| Topic | Weight | Papers | Last | Evidence papers |
|---|---|---|---|---|
Machine learning › Efficient and distributed learning
throughput optimization |
0.1 | 1 | 2014 | LCM cycle based optimal scheduling in robotic cell with parallel workstations · ICRA 2014 |
Methods — techniques the papers use, named apart from their topics
optimal scheduling · 0.2LCM cycle scheduling · 0.2
| Year | Publication | Venue | Position |
|---|---|---|---|
| 2015 | Probabilistic graph based spatial assembly relation inference for programming of assembly task by demonstrationabstractIn robot programming by demonstration (PBD) for assembly tasks, one of the important topics is to inference the poses and spatial relations of parts during the demonstration. In this paper, we propose a world model called assembly graph (AG) to achieve this task. The model is able to represent the poses of all parts, the relations, observations provided by vision techniques and prior knowledge in a unified probabilistic graph. Then the problem is stated as likelihood maximization estimation of pose parameters with the relations being the latent variables. Classification expectation maximization algorithm (CEM) is employed to solve the model. Besides, the contradiction between relations is incorporated as prior knowledge to better shape the posterior, thus guiding the algorithm find a more accurate solution. In experiments, both simulated and real world datasets are applied to evaluate the performance of our proposed method. The experimental results show that the AG gives better accuracy than the relations as deterministic variables (RDV) employed in some previous works due to the robustness and global consistency. Finally, the solution is implemented into a PBD system with ABB industrial robotic arm simulator as the execution stage, succeeding in real world captured assembly tasks. Yue Wang 0020, Yabiao Wang, Youzhong Hu, Rong Xiong, Yong Liu 0007, Jiafan Zhang, Liwei Qi |
IROS | 8 |
| 2014 | LCM cycle based optimal scheduling in robotic cell with parallel workstationsabstractRobot-centered cells play a more and more important role in the fields of incorporate automation and repetitive processing in order to increase productivity and to improve quality. In practice, it is always desired to achieve maximum/near-maximum throughput in a robotic cell. Sometimes, even a small improvement in throughput will be one of the highlighted objectives in robot scheduling, for instance, in the 3C industry of communication, computer and consumer electronics. In this paper, the scheduling problem in an n-workstation (n<;=8) m-stage robotic cell with parallel workstations is discussed by considering the constraints in real engineering practice, including free/non-free pick-up, allowed time window, and free/non-free process. A new method is proposed for optimal scheduling by means of optimally arranging each blocked cycles in every LCM cycle (Least Common Multiple), and assembling them in a proper order. This method is applied to a practical scheduling problem for a 7-workstation robotic cell. It is shown that the throughput is dramatically enhanced after optimization in the engineering scenario. Moreover, by comparing the resultant increase in revenue with the additional equipment costs, the result diagrams also provide managerial insights into links between throughput and cell layout flexibility. Jiafan Zhang, Xinyu Fang, Liwei Qi |
ICRA | 3 |