Demonstration venue · read-only. Every page can be browsed; the buttons that would change it are switched off. Create an account to run TaxoReview on your own data. A simulation from public publication records: the people listed were not invited and did not agree to review.
? Tutorial for this page

Tytus Pikies

dblp:259/2419 · DBLP profile ↗
← Back
2ranked-venue papers
2as first author
2since 2021 · last 2022
0000-0001-7608-435XORCID · corroborated

Domains — the database's venue-derived domains; a paper can count in several

Artificial intelligence and machine learning · 1 · 1 first-author · 1 since 2021Systems, architecture and hardware · 1 · 1 first-author · 1 since 2021

Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.

Theoretical computer science
1 paper
Mathematical optimization · 87% Computational complexity · 13%

Topics — the 2 heaviest of 3, each with the papers that count most for it

TopicWeightPapersLastEvidence papers
Mathematical optimization › scheduling
parallel machine scheduling
0.612022
Scheduling with complete multipartite incompatibility graph on parallel machines: Complexity and algorithms · Artif. Intell. 2022
Mathematical optimization
scheduling
0.612022
Scheduling with complete multipartite incompatibility graph on parallel machines: Complexity and algorithms · Artif. Intell. 2022

Methods — techniques the papers use, named apart from their topics

graph theory · 0.6
YearPublicationVenuePosition
2022 Scheduling on Uniform and Unrelated Machines with Bipartite Incompatibility Graphs
abstract
The problem of scheduling jobs on parallel machines under an incompatibility relation is considered in this paper. In this model, a binary relation between jobs is given and no two jobs that are in the relation can be scheduled on the same machine. We consider job scheduling under the incompatibility relation modeled by a bipartite graph, under the makespan optimality criterion, on uniform and unrelated machines. Unrelated machines are considered first. An FPTAS for$R2\vert G=bipartite\vert C_{\max}$is provided. We also show that for any$\epsilon > 0, b > 0$and$m\geq 3$, there is no polynomial-time algorithm of approximation ratio$\mathrm{O}(n^{b}p_{\max}^{1-\epsilon})$for$Rm\vert G$= bipartite$\vert C_{\max}$, unless P = NP. Uniform machines are considered as second. For any$\epsilon > 0$, we show that under P = NP assumption there is no polynomial-time$\mathrm{O}(n^{1/2-\epsilon}$)-approximation algorithm, even in the case of unit time jobs. We also provide a polynomial-time$\sqrt{\Sigma p_{j}}$-approximation algorithm for the case of jobs of arbitrary lengths$p_{j}$, matching the established bound. To enrich the analysis, bipartite graphs generated randomly according to Gilbert's model$\mathbb{G}_{n,n,p(n)}$are considered. We show that there exists an algorithm producing a schedule with makespan almost surely at most twice the optimum for a broad class of$p(n)$functions. To the best of our knowledge, this is the first study of randomly generated graphs in the context of scheduling in the considered model.
Tytus Pikies, Hanna Furmanczyk
IPDPS1
2022 Scheduling with complete multipartite incompatibility graph on parallel machines: Complexity and algorithms
Tytus Pikies, Krzysztof Turowski, Marek Kubale
Artif. Intell.1