Demo Data from VLDB 2026 / reviewers in the wild / expert
Umut Balli
dblp:47/2012
· DBLP profile ↗
2ranked-venue papers
1as first author
0since 2021 · last 2007
—ORCID · none
Domains — the database's venue-derived domains; a paper can count in several
Systems, architecture and hardware · 1 · 1 first-author
Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.
| Computer architecture, parallel and distributed computing, and storage systems
1 paper |
Embedded and real-time systems · 100% |
Topics — the 2 heaviest of 2, each with the papers that count most for it
| Topic | Weight | Papers | Last | Evidence papers |
|---|---|---|---|---|
Embedded and real-time systems
real-time scheduling |
0.1 | 1 | 2007 | Utility Accrual Real-Time Scheduling under Variable Cost Functions · IEEE Trans. Computers 2007 |
Embedded and real-time systems › real-time scheduling › soft real-time scheduling
reward-based scheduling |
0.1 | 1 | 2007 | Utility Accrual Real-Time Scheduling under Variable Cost Functions · IEEE Trans. Computers 2007 |
Methods — techniques the papers use, named apart from their topics
simulation · 0.1heuristic algorithm · 0.1
| Year | Publication | Venue | Position |
|---|---|---|---|
| 2007 | Utility Accrual Real-Time Scheduling under Variable Cost FunctionsabstractWe present a utility accrual real-time scheduling algorithm called CIC-VCUA for tasks whose execution times are functions of their starting times (and, potentially, other factors). We model such variable execution times using variable cost functions (or VCFs). The algorithm considers application activities that are subject to time/utility function time constraints, execution times described using VCFs, and mutual exclusion constraints on concurrent sharing of non-CPU resources. We consider the twofold scheduling objective of 1) assuring that the maximum interval between any two consecutive, successful completions of job instances in an activity must not exceed the activity period (an application-specific objective) and 2) maximizing the system's total accrued utility while satisfying mutual exclusion resource constraints. Since the scheduling problem is intractable, CIC-VCUA is a polynomial-time heuristic algorithm. The algorithm statically computes worst-case task sojourn times, dynamically selects tasks for execution based on their potential utility density, and completes tasks at specific times. We establish that CIC-VCUA achieves optimal timeliness during underloads, and tightly upper bounds inter and intratask completion times. Our simulation experiments confirm the algorithm's effectiveness and superiority Umut Balli, Haisang Wu, Binoy Ravindran, Jonathan Stephen Anderson, E. Douglas Jensen |
IEEE Trans. Computers | 1 |
| 2005 | Utility Accrual Real-Time Scheduling under Variable Cost FunctionsabstractWe present a real-time scheduling algorithm called VCUA, for tasks whose execution times are functions of their starting times. We model such variable execution times with variable cost functions (or VCFs). The algorithm considers application activities that are subject to time/utility function time constraints, VCFs, and the scheduling objective of assuring that the maximum interval between any two consecutive successful completions of jobs of a task must not exceed a specified bound, and maximizing the system's total utility. We establish that VCUA achieves optimal timeliness during under-loads, and identify the conditions under which timeliness assurances hold. Our simulation experiments illustrate VCUA's effectiveness and superiority. Haisang Wu, Umut Balli, Binoy Ravindran, E. Douglas Jensen |
RTCSA | 2 |