Demo Data from VLDB 2026 / reviewers in the wild / expert
J. A. Martin Gagné
dblp:50/6633
· DBLP profile ↗
2ranked-venue papers
0as first author
0since 2021 · last 1991
—ORCID · none
Domains — the database's venue-derived domains; a paper can count in several
Systems, architecture and hardware · 1Software engineering, systems software and programming languages · 1
Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.
| Computer architecture, parallel and distributed computing, and storage systems
1 paper |
Embedded and real-time systems · 100% |
Topics — the 3 heaviest of 3, each with the papers that count most for it
| Topic | Weight | Papers | Last | Evidence papers |
|---|---|---|---|---|
Embedded and real-time systems › real-time scheduling
multiprocessor scheduling |
0.0 | 1 | 1991 | A Pre-Run-Time Scheduling Algorithm For Hard Real-Time Systems · IEEE Trans. Software Eng. 1991 |
Embedded and real-time systems › real-time scheduling
pre-run-time scheduling |
0.0 | 1 | 1991 | A Pre-Run-Time Scheduling Algorithm For Hard Real-Time Systems · IEEE Trans. Software Eng. 1991 |
Embedded and real-time systems
real-time scheduling |
0.0 | 1 | 1991 | A Pre-Run-Time Scheduling Algorithm For Hard Real-Time Systems · IEEE Trans. Software Eng. 1991 |
Methods — techniques the papers use, named apart from their topics
implicit enumeration · 0.0branch-and-bound · 0.0
| Year | Publication | Venue | Position |
|---|---|---|---|
| 1991 | A Pre-Run-Time Scheduling Algorithm For Hard Real-Time SystemsabstractProcess scheduling, an important issue in the design and maintenance of hard real-time systems, is discussed. A pre-run-time scheduling algorithm that addresses the problem of process sequencing is presented. The algorithm is designed for multiprocessor applications with preemptable processes having release times, computation times, deadlines and arbitrary precedence and exclusion constraints. The algorithm uses a branch-and-bound implicit enumeration technique to generate a feasible schedule for each processor. The set of feasible schedules ensures that the timing specifications of the processes are observed and that all the precedence and exclusion constraints between pairs of processes are satisfied. the algorithm was tested using a model derived from the F-18 mission computer operational flight program.> Terry Shepard, J. A. Martin Gagné |
IEEE Trans. Software Eng. | 2 |
| 1990 | A Model of the F-18 Mission Computer Software for Pre-Run-Time SchedulingabstractThe development of pre-run-time schedulers for certain hard real-time applications is investigated. This scheduling scheme requires the modeling of the program as a set of processes with corresponding timing specifications, such as release times, computation times, and deadlines. The models must specify precedence and exclusion constraints between pairs of processes. It is processed by an offline pre-run-time scheduling algorithm that computes a schedule for use at run time, ensuring that all static timing constraints of the system are observed. The technique works best in cases in which most processes are periodic, which is true for the F-18. A modeling process for the M18 Mission Computer software that is designed to lead the application of pre-run-time scheduling to the software and is applicable to other such hard systems is described.> Terry Shepard, J. A. Martin Gagné |
ICDCS | 2 |