Demonstration venue · read-only. Every page can be browsed; the buttons that would change it are switched off. Create an account to run TaxoReview on your own data. A simulation from public publication records: the people listed were not invited and did not agree to review.
? Tutorial for this page

Keishi Sakamoto

dblp:80/6944 · DBLP profile ↗
← Back
9ranked-venue papers
2as first author
0since 2021 · last 2000
—ORCID · none

Domains — the database's venue-derived domains; a paper can count in several

Software engineering, systems software and programming languages · 8 · 2 first-authorSystems, architecture and hardware · 1

Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.

Software engineering, system software, and programming languages
5 papers
Empirical software engineering · 54% Requirements engineering and software design · 26% Software maintenance and evolution · 17%

Topics — the 7 heaviest of 9, each with the papers that count most for it

TopicWeightPapersLastEvidence papers
Empirical software engineering › software engineering research methodology
industrial case study
0.021998
Toward Computational Support for Software Process Improvement Activities · ICSE 1998
Improvement of Software Process by Process Description and Benefit Estimation · ICSE 1995
Software maintenance and evolution
software process improvement
0.021998
Toward Computational Support for Software Process Improvement Activities · ICSE 1998
Improvement of Software Process by Process Description and Benefit Estimation · ICSE 1995
Requirements engineering and software design
risk management
0.012000
Characterization of risky projects based on project managers' evaluation · ICSE 2000
Empirical software engineering
software project management
0.012000
Characterization of risky projects based on project managers' evaluation · ICSE 2000
Requirements engineering and software design › software process
software process modeling
0.021998
A New Software Project Simulator Based on Generalized Stochastic Petri-net · ICSE 1997
Toward Computational Support for Software Process Improvement Activities · ICSE 1998
Empirical software engineering
software effort estimation
0.011998
Analyzing Effects of Cost Estimation Accuracy on Quality and Productivity · ICSE 1998
Empirical software engineering › software economics
software productivity
0.011998
Analyzing Effects of Cost Estimation Accuracy on Quality and Productivity · ICSE 1998

Methods — techniques the papers use, named apart from their topics

statistical hypothesis testing · 0.0knowledge-based support · 0.0correlation analysis · 0.0case study · 0.0simulation · 0.0generalized stochastic petri nets · 0.0process modeling · 0.0
YearPublicationVenuePosition
2000 Characterization of risky projects based on project managers' evaluation
abstract
During the process of software development, senior managers often find indications that projects are risky and take appropriate actions to recover them from this dangerous status. If senior managers fail to detect such risks, it is possible that such projects may collapse completely.
Osamu Mizuno, Tohru Kikuno, Yasunari Takagi, Keishi Sakamoto
ICSE4
2000 Statistical analysis of deviation of actual cost from estimated cost using actual project data
Osamu Mizuno, Tohru Kikuno, Katsumi Inagaki, Yasunari Takagi, Keishi Sakamoto
Inf. Softw. Technol.5
1998 Analyzing Effects of Cost Estimation Accuracy on Quality and Productivity
abstract
This paper discusses the effects of estimation accuracy for software development cost on both the quality of the delivered code and the productivity of the development team. The estimation accuracy is measured by metric RE (relative error). The quality and productivity are measured by metrics FQ (field quality) and TP (team productivity). Using actual project data on thirty-one projects at a certain company, the following are verified by correlation analysis and testing of statistical hypotheses. There is a high correlation between the faithfulness of the development plan to standards and the value of RE (a coefficient of correlation between them is -0.60). Both FQ and TP are significantly different between projects with -10%<RE<+10% and projects with RE/spl ges/+10% (the level of significance is chosen as 0.05).
Osamu Mizuno, Tohru Kikuno, Katsumi Inagaki, Yasunari Takagi, Keishi Sakamoto
ICSE5
1998 Toward Computational Support for Software Process Improvement Activities
abstract
Software organizations and projects need guidance on how to improve software process, not just guidelines on what to improve. Several surveys demonstrate that the Capability Maturity Model (CMM) and ISO-9000 only provide the latter. We report our in-depth analysis on a seventeen-month effort in software process improvement (SPI) at OMRON Corporation. The goal of the analysis was to identify issues and challenges of SPI and to design a step-wise practical method to avoid such problems. Major problems we have found include the lack of shared goal among stakeholders, insufficient understanding of the current progress of SPI efforts, and underutilization of a large amount of complex information generated during SPI. We present the method for software organizations and projects for dealing with the problems, and argue for a knowledge-based SPI support system based on the method.
Keishi Sakamoto, Kumiyo Nakakoji, Yasunari Takagi, Naoki Niihara
ICSE1
1997 Estimating the Number of Faults using Simulator based on Generalized Stochastic Petri-Net Model
abstract
In order to manage software projects quantitatively, we have presented a new model far software project based on generalized stochastic Petri-net model which can take influence of human factors into account, and we have already developed software project simulator based on GSPN model. This paper proposes methods for calculating model parameters in the new model and estimating the number of faults in the design and debug phases of software process. Then we present experimental evaluation of proposed method using a data of actual software development project on a certain company. As the result of case study, we confirmed its effectiveness with respect to estimating the number of faults in the software process.
Osamu Mizuno, Shinji Kusumoto, Tohru Kikuno, Yasunari Takagi, Keishi Sakamoto
Asian Test Symposium5
1997 A New Software Project Simulator Based on Generalized Stochastic Petri-net
abstract
In this paper, we propose a new model for software projects and an estimation method for the quality, cost and delivery date.The new model consists of Project model and Process model.Project model focuses on three key components: activity, product and developer of the project.Process model includes a set of Activity models, each of which specifies design, coding, review, test, and debug activities respectively using GSPN.Moreover, the new model can take the influence of human factors into account by introducing the concept of "workload".Next, we develop a simulator which supports description of the target process, executes the process described by Activity model and analyses the simulation results statistically.Then, we apply the simulator to real software projects at certain organization and compare the estimated values with actual data.The experimental results show the applicability of the proposed simulator to manage real software project in the future.
Shinji Kusumoto, Osamu Mizuno, Tohru Kikuno, Yuji Hirayama, Yasunari Takagi, Keishi Sakamoto
ICSE6
1996 Analysis of Software Process Improvement Experience Using the Project Visibility Index
abstract
Based on the capability maturity model (CMM), process improvement at OMRON, a Japanese microprocessor manufacturer, increased project predictability in three ways: accuracy, variability, and performance. The authors use the project visibility index (PVI) and other measurements to quantitatively demonstrate this. Qualitative analysis of how and why OMRON achieved higher project visibility and increases in the QCD (quality, cost, and delivery on time) factors are supported with data on review-effort ratios and productivity. They identify factors directly affected by high project visibility.
Keishi Sakamoto, Naoki Niihara, Toshifumi Tanaka, Kumiyo Nakakoji, Kouichi Kishida
APSEC1
1995 Improvement of Software Process by Process Description and Benefit Estimation
abstract
This paper describes an actual experience of software process improvement at OMRON corporation.posed procedure are proven to be effective for reclucing the development effort at OM RON corporation.
Toshifumi Tanaka, Keishi Sakamoto, Shinji Kusumoto, Ken-ichi Matsumoto, Tohru Kikuno
ICSE2
1995 Analysis of review's effectiveness based on software metrics
abstract
The paper statistically analyzes the relationship between review and software quality and the relationship between review and productivity, utilizing software metrics on 36 actual projects executed in the OMRON Corporation from 1992 to 1994. Firstly, by examining the relationship between review effort and field quality (the number of faults after delivery) of each project, and the relationship between the number of faults detected in review and field quality of each project, we reasoned that: (1) greater review effort helps to increase field quality (decrease the number of faults after delivery); (2) source code review is more effective in order to increase field quality than design review; (3) if more than 10% of total design and programming effort is spent on review, one can achieve a quite stable field quality. We noticed that no relevant effects were recognized in productivity (LOC/staff month) with respect to a review rate of up to 20%. As a result of the analysis above, we recommended that 15% of review effort is a suitable percentage to use as a guideline for our software project management.
Yasunari Takagi, Toshifumi Tanaka, Naoki Niihara, Keishi Sakamoto, Shinji Kusumoto, Tohru Kikuno
ISSRE4