Demo Data from VLDB 2026 / reviewers in the wild / expert
Frederik Stork
dblp:82/2531
· DBLP profile ↗
3ranked-venue papers
0as first author
0since 2021 · last 2004
—ORCID · none
Domains — the database's venue-derived domains; a paper can count in several
Theory of computation · 3
Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.
| Theoretical computer science
2 papers |
Mathematical optimization · 100% |
Topics — the 2 heaviest of 2, each with the papers that count most for it
| Topic | Weight | Papers | Last | Evidence papers |
|---|---|---|---|---|
Mathematical optimization › scheduling
precedence constrained scheduling |
0.1 | 2 | 2004 | Scheduling with AND/OR Precedence Constraints · SIAM J. Comput. 2004 Forcing relations for AND/OR precedence constraints · SODA 2000 |
Mathematical optimization
scheduling |
0.0 | 1 | 2004 | Scheduling with AND/OR Precedence Constraints · SIAM J. Comput. 2004 |
Methods — techniques the papers use, named apart from their topics
polynomial-time algorithm · 0.0linear-time algorithm · 0.0forcing relations · 0.0
| Year | Publication | Venue | Position |
|---|---|---|---|
| 2004 | Scheduling with AND/OR Precedence ConstraintsabstractIn many scheduling applications it is required that the processing of some job be postponed until some other job, which can be chosen from a pregiven set of alternatives, has been completed. The traditional concept of precedence constraints fails to model such restrictions. Therefore, the concept has been generalized to so-called AND/OR precedence constraints which can cope with this kind of requirement. In the context of traditional precedence constraints, feasibility, transitivity, and the computation of earliest start times for jobs are fundamental, well-studied problems. The purpose of this paper is to provide efficient algorithms for these tasks for the more general model of AND/OR precedence constraints. We show that feasibility as well as many questions related to transitivity can be solved by applying essentially the same linear-time algorithm. In order to compute earliest start times we propose two polynomial-time algorithms to cope with different classes of time distances between jobs. Rolf H. Möhring, Martin Skutella, Frederik Stork |
SIAM J. Comput. | 3 |
| 2000 | Forcing relations for AND/OR precedence constraints
Rolf H. Möhring, Martin Skutella, Frederik Stork |
SODA | 3 |
| 1999 | Resource-Constrained Project Scheduling: Computing Lower Bounds by Solving Minimum Cut Problems
Rolf H. Möhring, Andreas S. Schulz, Frederik Stork, Marc Uetz |
ESA | 3 |