Demonstration venue · read-only. Every page can be browsed; the buttons that would change it are switched off. Create an account to run TaxoReview on your own data. A simulation from public publication records: the people listed were not invited and did not agree to review.
? Tutorial for this page

Timothy D. Mount

dblp:m/TDMount · also Tim Mount, Timothy Mount · DBLP profile ↗
← Back
6ranked-venue papers
2as first author
0since 2021 · last 2011
—ORCID · none

Domains — the database's venue-derived domains; a paper can count in several

Artificial intelligence and machine learning · 4 · 1 first-authorGraphics, computer vision, multimedia, augmented reality and games · 1 · 1 first-authorApplied, interdisciplinary, general and emerging computing · 1

Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.

Interdisciplinary, comprehensive, and emerging computing
1 paper
Energy systems and smart grids · 77% Computational finance and economics · 23%

Topics — the 1 heaviest of 2, each with the papers that count most for it

TopicWeightPapersLastEvidence papers
Energy systems and smart grids › power system planning and operation
power system planning
0.112005
Transmission System Planning-The Old World Meets The New · Proc. IEEE 2005

Methods — techniques the papers use, named apart from their topics

scenario analysis · 0.1
YearPublicationVenuePosition
2011 Modeling nodal prices in deregulated electricity markets in the usa: current practices and future needs
abstract
The purpose of this paper is to model the stochastic behavior of the nodal prices of electricity in deregulated markets in the USA, and in particular, to explain how this behavior has changed over time. These changes require different modeling strategies to capture the salient features of the market. The paper discusses three different models. The first model represents the period immediately after deregulation when price spikes were observed during the summer months using stochastic regime switching. Regulators in the northeastern markets responded to these "uncompetitive" price spikes by implementing various forms of market monitoring to mitigate the speculative behavior of generators. However, in a market like New York State, congestion on the transmission lines transferring power to New York City still led to spatial price differences. A new market for Transmission Congestion Credits (TCC) was established to allow generators to hedge these price differences. The second strategy uses Vector Autoregressive (VAR) Models of temperature, demand and price to estimate the financial riskiness of holding a TCC. Finally, current research on modeling the demand for electricity on networks with high penetrations of renewable sources of generation is discussed. Since these sources of generation are generally intermittent, it is likely that controllable demand, such as charging electric vehicles and thermal storage, will be increasingly important as a way to mitigate the variability of supply. These technologies present new challenges for modeling the demand for electricity. It will be important to capture the ability to shift demand from peak to off-peak periods as well as to mitigate the variability of renewable generation.
Timothy D. Mount
ICASSP1
2005 Location-based scheduling and pricing for energy and reserves: a responsive reserve market proposal
Jie Chen 0017, Timothy D. Mount, James S. Thorp, Robert J. Thomas
Decis. Support Syst.2
2005 Identification of load pockets and market power in electric power systems
Bernard C. Lesieutre, Robert J. Thomas, Timothy D. Mount
Decis. Support Syst.3
2005 A method for classifying offer strategies observed in an electricity market
HyungSeon Oh, Robert J. Thomas, Bernard C. Lesieutre, Timothy D. Mount
Decis. Support Syst.4
2005 Transmission System Planning-The Old World Meets The New
abstract
Transmission systems in the United States and around the world have become more difficult to plan under deregulation. Uncertainties in generation type, location, and pricing coupled with market mechanisms that encourage transfers not designed for in the legacy transmission system have made the transmission planner's life difficult. This paper describes the planning process under regulation, some of the issues encountered during the present transition to a deregulated industry, and some of the open questions that need to be addressed in the United States.
Robert J. Thomas, James T. Whitehead, Hugh Outhred, Timothy D. Mount
Proc. IEEE4
2001 Market power and price volatility in restructured markets for electricity
Timothy D. Mount
Decis. Support Syst.1