Demo Data from VLDB 2026 / reviewers in the wild / expert
Timothy D. Mount
dblp:m/TDMount · also Tim Mount, Timothy Mount
· DBLP profile ↗
6ranked-venue papers
2as first author
0since 2021 · last 2011
—ORCID · none
Domains — the database's venue-derived domains; a paper can count in several
Artificial intelligence and machine learning · 4 · 1 first-authorGraphics, computer vision, multimedia, augmented reality and games · 1 · 1 first-authorApplied, interdisciplinary, general and emerging computing · 1
Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.
| Interdisciplinary, comprehensive, and emerging computing
1 paper |
Energy systems and smart grids · 77% Computational finance and economics · 23% |
Topics — the 1 heaviest of 2, each with the papers that count most for it
| Topic | Weight | Papers | Last | Evidence papers |
|---|---|---|---|---|
Energy systems and smart grids › power system planning and operation
power system planning |
0.1 | 1 | 2005 | Transmission System Planning-The Old World Meets The New · Proc. IEEE 2005 |
Methods — techniques the papers use, named apart from their topics
scenario analysis · 0.1
| Year | Publication | Venue | Position |
|---|---|---|---|
| 2011 | Modeling nodal prices in deregulated electricity markets in the usa: current practices and future needsabstractThe purpose of this paper is to model the stochastic behavior of the nodal prices of electricity in deregulated markets in the USA, and in particular, to explain how this behavior has changed over time. These changes require different modeling strategies to capture the salient features of the market. The paper discusses three different models. The first model represents the period immediately after deregulation when price spikes were observed during the summer months using stochastic regime switching. Regulators in the northeastern markets responded to these "uncompetitive" price spikes by implementing various forms of market monitoring to mitigate the speculative behavior of generators. However, in a market like New York State, congestion on the transmission lines transferring power to New York City still led to spatial price differences. A new market for Transmission Congestion Credits (TCC) was established to allow generators to hedge these price differences. The second strategy uses Vector Autoregressive (VAR) Models of temperature, demand and price to estimate the financial riskiness of holding a TCC. Finally, current research on modeling the demand for electricity on networks with high penetrations of renewable sources of generation is discussed. Since these sources of generation are generally intermittent, it is likely that controllable demand, such as charging electric vehicles and thermal storage, will be increasingly important as a way to mitigate the variability of supply. These technologies present new challenges for modeling the demand for electricity. It will be important to capture the ability to shift demand from peak to off-peak periods as well as to mitigate the variability of renewable generation. Timothy D. Mount |
ICASSP | 1 |
| 2005 | Location-based scheduling and pricing for energy and reserves: a responsive reserve market proposal
Jie Chen 0017, Timothy D. Mount, James S. Thorp, Robert J. Thomas |
Decis. Support Syst. | 2 |
| 2005 | Identification of load pockets and market power in electric power systems
Bernard C. Lesieutre, Robert J. Thomas, Timothy D. Mount |
Decis. Support Syst. | 3 |
| 2005 | A method for classifying offer strategies observed in an electricity market
HyungSeon Oh, Robert J. Thomas, Bernard C. Lesieutre, Timothy D. Mount |
Decis. Support Syst. | 4 |
| 2005 | Transmission System Planning-The Old World Meets The NewabstractTransmission systems in the United States and around the world have become more difficult to plan under deregulation. Uncertainties in generation type, location, and pricing coupled with market mechanisms that encourage transfers not designed for in the legacy transmission system have made the transmission planner's life difficult. This paper describes the planning process under regulation, some of the issues encountered during the present transition to a deregulated industry, and some of the open questions that need to be addressed in the United States. Robert J. Thomas, James T. Whitehead, Hugh Outhred, Timothy D. Mount |
Proc. IEEE | 4 |
| 2001 | Market power and price volatility in restructured markets for electricity
Timothy D. Mount |
Decis. Support Syst. | 1 |