Demonstration venue · read-only. Every page can be browsed; the buttons that would change it are switched off. Create an account to run TaxoReview on your own data. A simulation from public publication records: the people listed were not invited and did not agree to review.
? Tutorial for this page

Jens Fortmann

dblp:128/2780 · DBLP profile ↗
← Back
1ranked-venue papers
0as first author
0since 2021 · last 2013
0000-0002-0189-3483ORCID · reported

Domains — the database's venue-derived domains; a paper can count in several

Applied, interdisciplinary, general and emerging computing · 1

Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.

Interdisciplinary, comprehensive, and emerging computing
1 paper
Energy systems and smart grids · 100%

Topics — the 2 heaviest of 2, each with the papers that count most for it

TopicWeightPapersLastEvidence papers
Energy systems and smart grids › renewable energy
offshore wind power
0.212013
Offshore Wind Power Generation Technologies · Proc. IEEE 2013
Energy systems and smart grids › renewable energy
grid integration
0.012013
Offshore Wind Power Generation Technologies · Proc. IEEE 2013
YearPublicationVenuePosition
2013 Offshore Wind Power Generation Technologies
abstract
This paper provides an overview of the current state of the technology of offshore wind-based power generation and the technological challenges with emphasis on the electrical parts. First, a brief review of the core control functions, their correlation with operational behavior, and the grid-supporting capability of the machine during normal operation as well as during contingency situations are provided. This is followed by the discussion of basic considerations in wind farm collector design, including topology, grounding options, and outlay of the offshore substation. Then, issues related to offshore turbine foundation and typical dimensions of the offshore substation platform are discussed. The platform is designed to accommodate the main and grounding transformers, the switch gear, and other assorted accessories. Next, options for the transmission link from the offshore plant to the grid onshore are reviewed. Finally, a discussion of issues related to grid integration together with currently applicable special grid code requirements concludes the paper.
István Erlich, Fekadu Shewarega, Christian Feltes, Friedrich W. Koch, Jens Fortmann
Proc. IEEE5