Demo Data from SIGIR 2026 / reviewers in the wild / expert
Sebastian Ott
dblp:133/1077
· DBLP profile ↗
6ranked-venue papers
0as first author
0since 2021 · last 2019
—ORCID · none
Domains — the database's venue-derived domains; a paper can count in several
Theory of computation · 6
Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.
| Theoretical computer science
1 paper |
Approximation and online algorithms · 75% Mathematical optimization · 25% |
Topics — the 4 heaviest of 4, each with the papers that count most for it
| Topic | Weight | Papers | Last | Evidence papers |
|---|---|---|---|---|
Approximation and online algorithms
approximation algorithms |
0.2 | 1 | 2015 | A Fully Polynomial-Time Approximation Scheme for Speed Scaling with Sleep State · SODA 2015 |
Approximation and online algorithms › approximation schemes
FPTAS |
0.2 | 1 | 2015 | A Fully Polynomial-Time Approximation Scheme for Speed Scaling with Sleep State · SODA 2015 |
Mathematical optimization
scheduling |
0.2 | 1 | 2015 | A Fully Polynomial-Time Approximation Scheme for Speed Scaling with Sleep State · SODA 2015 |
Approximation and online algorithms › online algorithms › online scheduling
speed scaling |
0.2 | 1 | 2015 | A Fully Polynomial-Time Approximation Scheme for Speed Scaling with Sleep State · SODA 2015 |
Methods — techniques the papers use, named apart from their topics
non-preemptive transformation · 0.2lexicographic ordering · 0.2discretization · 0.2
| Year | Publication | Venue | Position |
|---|---|---|---|
| 2019 | A Fully Polynomial-Time Approximation Scheme for Speed Scaling with a Sleep StateabstractWe study classical deadline-based preemptive scheduling of jobs in a computing environment equipped with both dynamic speed scaling and sleep state capabilities: Each job is specified by a release time, a deadline and a processing volume, and has to be scheduled on a single, speed-scalable processor that is supplied with a sleep state. In the sleep state, the processor consumes no energy, but a constant wake-up cost is required to transition back to the active state. In contrast to speed scaling alone, the addition of a sleep state makes it sometimes beneficial to accelerate the processing of jobs in order to transition the processor to the sleep state for longer amounts of time and incur further energy savings. The goal is to output a feasible schedule that minimizes the energy consumption. Since the introduction of the problem by Irani et al. (ACM Trans Algorithms 3(4), 2007), its exact computational complexity has been repeatedly posed as an open question (see e.g. Albers and Antoniadis in ACM Trans Algorithms 10(2):9, 2014; Baptiste et al. in ACM Trans Algorithms 8(3):26, 2012; Irani and Pruhs in SIGACT News 36(2):63–76, 2005). The currently best known upper and lower bounds are a 4 / 3-approximation algorithm and NP-hardness due to Albers and Antoniadis (2014) and Kumar and Shannigrahi (CoRR, 2013. arXiv:1304.7373 ), respectively. We close the aforementioned gap between the upper and lower bound on the computational complexity of speed scaling with sleep state by presenting a fully polynomial-time approximation scheme for the problem. The scheme is based on a transformation to a non-preemptive variant of the problem, and a discretization that exploits a carefully defined lexicographical ordering among schedules. Antonios Antoniadis 0001, Chien-Chung Huang 0001, Sebastian Ott |
Algorithmica | 3 |
| 2017 | Continuous speed scaling with variability: A simple and direct approach
Antonios Antoniadis 0001, Peter Kling, Sebastian Ott, Sören Riechers |
Theor. Comput. Sci. | 3 |
| 2016 | A Combinatorial Approximation Algorithm for Graph Balancing with Light Hyper EdgesabstractMakespan minimization in restricted assignment (R|p_{ij} in {p_j, infinity}|C_{max}) is a classical problem in the field of machine scheduling. In a landmark paper, [Lenstra, Shmoys, and Tardos, Math. Progr. 1990] gave a 2-approximation algorithm and proved that the problem cannot be approximated within 1.5 unless P=NP. The upper and lower bounds of the problem have been essentially unimproved in the intervening 25 years, despite several remarkable successful attempts in some special cases of the problem recently. In this paper, we consider a special case called graph-balancing with light hyper edges, where heavy jobs can be assigned to at most two machines while light jobs can be assigned to any number of machines. For this case, we present algorithms with approximation ratios strictly better than 2. Specifically, - Two job sizes: Suppose that light jobs have weight w and heavy jobs have weight W, and w < W. We give a 1.5-approximation algorithm (note that the current 1.5 lower bound is established in an even more restrictive setting). Indeed, depending on the specific values of w and W, sometimes our algorithm guarantees sub-1.5 approximation ratios. - Arbitrary job sizes: Suppose that W is the largest given weight, heavy jobs have weights in the range of (beta W, W], where 4/7 <= beta < 1, and light jobs have weights in the range of (0,beta W]. We present a (5/3+beta/3)-approximation algorithm. Our algorithms are purely combinatorial, without the need of solving a linear program as required in most other known approaches. Chien-Chung Huang 0001, Sebastian Ott |
ESA | 2 |
| 2015 | A Fully Polynomial-Time Approximation Scheme for Speed Scaling with Sleep StateabstractWe study classical deadline-based preemptive scheduling of jobs in a computing environment equipped with both dynamic speed scaling and sleep state capabilities: Each job is specified by a release time, a deadline and a processing volume, and has to be scheduled on a single, speed-scalable processor that is supplied with a sleep state. In the sleep state, the processor consumes no energy, but a constant wake-up cost is required to transition back to the active state. In contrast to speed scaling alone, the addition of a sleep state makes it sometimes beneficial to accelerate the processing of jobs in order to transition the processor to the sleep state for longer amounts of time and incur further energy savings. The goal is to output a feasible schedule that minimizes the energy consumption. Since the introduction of the problem by Irani et al. [17], its exact computational complexity has been repeatedly posed as an open question (see e.g. [2,9,16]). The currently best known upper and lower bounds are a 4/3-approximation algorithm and NP-hardness due to [2] and [2,18], respectively. We close the aforementioned gap between the upper and lower bound on the computational complexity of speed scaling with sleep state by presenting a fully polynomial-time approximation scheme for the problem. The scheme is based on a transformation to a non-preemptive variant of the problem, and a discretization that exploits a carefully defined lexicographical ordering among schedules. Antonios Antoniadis 0001, Chien-Chung Huang 0001, Sebastian Ott |
SODA | 3 |
| 2014 | New Results for Non-Preemptive Speed Scaling
Chien-Chung Huang 0001, Sebastian Ott |
MFCS (2) | 2 |
| 2013 | How to Pack Your Items When You Have to Buy Your Knapsack
Antonios Antoniadis 0001, Chien-Chung Huang 0001, Sebastian Ott, José Verschae |
MFCS | 3 |