Demonstration venue · read-only. Every page can be browsed; the buttons that would change it are switched off. Create an account to run TaxoReview on your own data. A simulation from public publication records: the people listed were not invited and did not agree to review.
? Tutorial for this page

Ron Allan

dblp:314/5130 · DBLP profile ↗
← Back
1ranked-venue papers
1as first author
0since 2021 · last 2000
—ORCID · none

Domains — the database's venue-derived domains; a paper can count in several

Applied, interdisciplinary, general and emerging computing · 1 · 1 first-author

Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.

Interdisciplinary, comprehensive, and emerging computing
1 paper
Energy systems and smart grids · 100%

Topics — the 1 heaviest of 2, each with the papers that count most for it

TopicWeightPapersLastEvidence papers
Energy systems and smart grids › power system planning and operation
power system reliability
0.012000
Probabilistic assessment of power systems · Proc. IEEE 2000

Methods — techniques the papers use, named apart from their topics

probabilistic method · 0.0
YearPublicationVenuePosition
2000 Probabilistic assessment of power systems
abstract
Reliability is an important issue in power systems and historically has been assessed using deterministic criteria and indexes. However, these approaches can be, and in many cases have been, replaced by probabilistic methods that are able to respond to the actual stochastic factors that influence the reliability of the system. In the days of global, completely integrated and/or nationalized electricity supply industries, the only significant objective was the reliability seen by actual end users. Also, the system was structured in a relatively simple way such that generation, transmission, and distribution could be assessed as a series of sequential hierarchical levels. Failures at any level could cause interruptions of supply to the end user. All planning and operational criteria were intended to minimize such interruptions within economic limits. The system has been, or is being, restructured and now many individual parties are involved, often competitively, including generators, network owners, network operators, energy suppliers, regulators, as well as the end users. Each of these parties has a need to know the quality and performance of the system sector or subsector for which they are responsible. Therefore, there is now a need for a range of reliability measures; the actual measure(s) needed varying between the different system parties. This paper addresses these issues and, in particular, reviews existing approaches and how these may be used and/or adapted to suit the needs and the required indexes of the new competitive industry and the different parties associated with it.
Ron Allan, Roy Billinton
Proc. IEEE1