Demo Data from SIGIR 2026 / reviewers in the wild / expert
Ramón Companys
dblp:48/533
· DBLP profile ↗
6ranked-venue papers
0as first author
1since 2021 · last 2021
—ORCID · none
Domains — the database's venue-derived domains; a paper can count in several
Artificial intelligence and machine learning · 6 · 1 since 2021Systems, architecture and hardware · 1
Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.
| Theoretical computer science
1 paper |
Mathematical optimization · 100% |
Topics — the 5 heaviest of 5, each with the papers that count most for it
| Topic | Weight | Papers | Last | Evidence papers |
|---|---|---|---|---|
Mathematical optimization › scheduling › production scheduling
assembly line balancing |
0.0 | 1 | 2000 | Local Search Heuristics for the Assembly Line Balancing Problem with Incompatibilities Between Tasks · ICRA 2000 |
Mathematical optimization
combinatorial optimization |
0.0 | 1 | 2000 | Local Search Heuristics for the Assembly Line Balancing Problem with Incompatibilities Between Tasks · ICRA 2000 |
Mathematical optimization › evolutionary computation
genetic algorithm |
0.0 | 1 | 2000 | Local Search Heuristics for the Assembly Line Balancing Problem with Incompatibilities Between Tasks · ICRA 2000 |
Mathematical optimization
metaheuristic optimization |
0.0 | 1 | 2000 | Local Search Heuristics for the Assembly Line Balancing Problem with Incompatibilities Between Tasks · ICRA 2000 |
Mathematical optimization › combinatorial optimization
local search |
0.0 | 1 | 2000 | Local Search Heuristics for the Assembly Line Balancing Problem with Incompatibilities Between Tasks · ICRA 2000 |
Methods — techniques the papers use, named apart from their topics
priority rule heuristics · 0.0greedy randomized adaptive search · 0.0genetic algorithm · 0.0
| Year | Publication | Venue | Position |
|---|---|---|---|
| 2021 | An iterated greedy algorithm for the parallel blocking flow shop scheduling problem and sequence-dependent setup timesabstractThis paper deals with the problem of scheduling jobs in a parallel flow shop configuration under the blocking constraint, in which the setup time of machines depends not only on the job to be processed but also on the previously processed one, i.e., there are sequence-dependent setup times. The performance analysis of several iterated greedy algorithms with different initial solution procedures and local searches lets us define an efficient algorithm to minimize the maximum job completion time. Moreover, the computational evaluation showed the efficiency of searching in different neighborhood structures and noted the significant influence of the initial solution. However, contrary to other scheduling problems, starting with a high quality solution does not guarantee better performance of the algorithm. Imma Ribas, Ramón Companys, Xavier Tort-Martorell |
Expert Syst. Appl. | 2 |
| 2019 | An iterated greedy algorithm for solving the total tardiness parallel blocking flow shop scheduling problem
Imma Ribas, Ramón Companys, Xavier Tort-Martorell |
Expert Syst. Appl. | 2 |
| 2017 | Efficient heuristics for the parallel blocking flow shop scheduling problem
Imma Ribas, Ramón Companys, Xavier Tort-Martorell |
Expert Syst. Appl. | 2 |
| 2015 | An efficient Discrete Artificial Bee Colony algorithm for the blocking flow shop problem with total flowtime minimization
Imma Ribas, Ramón Companys, Xavier Tort-Martorell |
Expert Syst. Appl. | 2 |
| 2012 | Solving the Fm∣block∣Cmax problem using Bounded Dynamic Programming
Joaquín Bautista, Alberto Cano 0002, Ramón Companys, Imma Ribas |
Eng. Appl. Artif. Intell. | 3 |
| 2000 | Local Search Heuristics for the Assembly Line Balancing Problem with Incompatibilities Between TasksabstractThis paper deals with the assembly line balancing problem considering incompatibilities between the tasks with the aim of: first minimizing the number of workstations, and then minimizing the cycle time for the minimum number of workstations. In order to solve the problem we propose the use of a greedy randomized adaptive search procedure obtained from the application of some classic heuristics based on priority rules, and a genetic algorithm that searches for the solution in the heuristic space. A computational experience is included to illustrate the performance of the proposed approach. Joaquín Bautista, Raúl Suárez, Manuel Mateo, Ramón Companys |
ICRA | 4 |