Demo Data from SIGIR 2026 / reviewers in the wild / expert
Roger D. H. Warburton
dblp:59/1330
· DBLP profile ↗
1ranked-venue papers
1as first author
0since 2021 · last 1983
—ORCID · none
Domains — the database's venue-derived domains; a paper can count in several
Software engineering, systems software and programming languages · 1 · 1 first-author
Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.
| Software engineering, system software, and programming languages
1 paper |
Empirical software engineering · 100% | |
| Computer architecture, parallel and distributed computing, and storage systems
1 paper |
Embedded and real-time systems · 100% |
Topics — the 4 heaviest of 4, each with the papers that count most for it
| Topic | Weight | Papers | Last | Evidence papers |
|---|---|---|---|---|
Empirical software engineering
software effort estimation |
0.0 | 1 | 1983 | Managing and Predicting the Costs of Real-Time Software · IEEE Trans. Software Eng. 1983 |
Empirical software engineering
software project management |
0.0 | 1 | 1983 | Managing and Predicting the Costs of Real-Time Software · IEEE Trans. Software Eng. 1983 |
Embedded and real-time systems › embedded software
embedded applications |
0.0 | 1 | 1983 | Managing and Predicting the Costs of Real-Time Software · IEEE Trans. Software Eng. 1983 |
Embedded and real-time systems
real-time software |
0.0 | 1 | 1983 | Managing and Predicting the Costs of Real-Time Software · IEEE Trans. Software Eng. 1983 |
Methods — techniques the papers use, named apart from their topics
staffing curve analysis · 0.0putnam model · 0.0
| Year | Publication | Venue | Position |
|---|---|---|---|
| 1983 | Managing and Predicting the Costs of Real-Time SoftwareabstractThe Putnam model can be used to predict and manage software development projects. It is a management tool that takes, as input, easily obtained manpower data and produces cost and schedule estimates. This paper examines data from two real-time software projects and analyzes the applicability of the Putnam model. We propose a variation ation of the model which more reliably follows the staffing curve of real-time software applications. A critical analysis of the assumptions is presented and the parameters are reinterpreted so that they reflect the environment of embedded applications. Two projects are analyzed from actual data. It is shown how management decisions are reflected in the model. Even erratic and incomplete data can yield valuable conclusions. It is also shown that the model is appropriate to software developed with modern practices. We show how valuable management information can be obtained by laying out the data in a systematic manner. Roger D. H. Warburton |
IEEE Trans. Software Eng. | 1 |