Demo Data from EDBT 2026 / reviewers in the wild / expert
Tatsuya Wakisaka
dblp:07/1470
· DBLP profile ↗
1ranked-venue papers
0as first author
0since 2021 · last 1998
—ORCID · none
Domains — the database's venue-derived domains; a paper can count in several
Artificial intelligence and machine learning · 1Systems, architecture and hardware · 1
Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.
| Artificial intelligence
1 paper |
Legged, aerial and field robots · 100% | |
| Interdisciplinary, comprehensive, and emerging computing
1 paper |
Smart cities and intelligent transportation · 100% | |
| Computer architecture, parallel and distributed computing, and storage systems
1 paper |
Embedded and real-time systems · 100% |
Topics — the 3 heaviest of 3, each with the papers that count most for it
| Topic | Weight | Papers | Last | Evidence papers |
|---|---|---|---|---|
Robotics › Legged, aerial and field robots
construction robotics |
0.0 | 1 | 1998 | Development of Automated Construction System for High-Rise Reinforced Concrete Buildings · ICRA 1998 |
Smart cities and intelligent transportation
construction automation |
0.0 | 1 | 1998 | Development of Automated Construction System for High-Rise Reinforced Concrete Buildings · ICRA 1998 |
Embedded and real-time systems
cyber-physical system platforms |
0.0 | 1 | 1998 | Development of Automated Construction System for High-Rise Reinforced Concrete Buildings · ICRA 1998 |
Methods — techniques the papers use, named apart from their topics
system development · 0.1field deployment · 0.1
| Year | Publication | Venue | Position |
|---|---|---|---|
| 1998 | Development of Automated Construction System for High-Rise Reinforced Concrete BuildingsabstractAn all-weather automated construction system has been developed to reduce the total cost of high-rise reinforced concrete building construction. It was applied for the first time in the world to the construction of a 26-story reinforced concrete condominium project in Chiba Prefecture in 1995. This system incorporates four major elements: 1) a synchronously climbing all-weather temporary roof; 2) a parallel material delivery system; 3) prefabrication and unification of construction materials; and 4) a material management system. It ensures good quality; improves the working and environmental conditions; reduces the construction period, manpower and waste; and improves overall productivity. Koji Hamada, Noriyuki Furuya, Yasuo Inoue, Tatsuya Wakisaka |
ICRA | 4 |