EDBT 2026 Demo / reviewers in the wild / expert
Ulrich A. W. Tetzlaff
dblp:07/7268
· DBLP profile ↗
2ranked-venue papers
1as first author
0since 2021 · last 1999
—ORCID · none
Domains — the database's venue-derived domains; a paper can count in several
Theory of computation · 1Applied, interdisciplinary, general and emerging computing · 1 · 1 first-author
Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.
| Computer architecture, parallel and distributed computing, and storage systems
1 paper |
Performance modeling and evaluation · 100% | |
| Theoretical computer science
1 paper |
Mathematical optimization · 100% |
Topics — the 4 heaviest of 4, each with the papers that count most for it
| Topic | Weight | Papers | Last | Evidence papers |
|---|---|---|---|---|
Performance modeling and evaluation
queueing models |
0.0 | 1 | 1999 | Optimal workload allocation between a job shop and an FMS · IEEE Trans. Robotics Autom. 1999 |
Performance modeling and evaluation › queueing models
queueing network analysis |
0.0 | 1 | 1999 | Optimal workload allocation between a job shop and an FMS · IEEE Trans. Robotics Autom. 1999 |
Mathematical optimization › continuous optimization
nonlinear optimization |
0.0 | 1 | 1999 | Optimal workload allocation between a job shop and an FMS · IEEE Trans. Robotics Autom. 1999 |
Mathematical optimization
linear programming |
0.0 | 1 | 1999 | Optimal workload allocation between a job shop and an FMS · IEEE Trans. Robotics Autom. 1999 |
Methods — techniques the papers use, named apart from their topics
product-form queueing networks · 0.0gradient search · 0.0fixed-point iteration · 0.0decomposition · 0.0
| Year | Publication | Venue | Position |
|---|---|---|---|
| 1999 | Optimal workload allocation between a job shop and an FMSabstractAssuming given production requirements for a set of part types, we examine the question of how these production requirements can be assigned to different, alternative routes through two production systems, a flexible manufacturing system, and a conventional job shop. Several nonlinear optimization models are proposed in order to optimize performance parameters like throughput, work-in-process inventory, utilization, and manufacturing lead time. The models incorporate product form queueing network theory in order to evaluate system performance and extend results based on linear programming formulations. The solution procedures are based on decomposition, fixed point, and classical gradient search techniques. Ulrich A. W. Tetzlaff, Erwin Pesch |
IEEE Trans. Robotics Autom. | 1 |
| 1996 | Constraint Propagation Based Scheduling of Job ShopsabstractThis paper examines the minimum makespan problem for the job shop from an artificial intelligence point of view. A new solution procedure is presented which combines general learning strategies with special purpose heuristics, i.e., a constraint propagation based procedure is used and by decomposing the whole problem into single machine problems, problem specific knowledge is introduced. Fundamental for this approach is the equivalency between the constraint and the disjunctive graph. Presented comprehensive computational tests show high quality partial solutions, substantially accelerated exact methods, and a gain of deeper insight into the nature of the underlying problem instances. For example, the propagation and decomposition techniques reveal the particular structure underlying the well-known Fisher and Thompson 10 × 10 problem and thus provide an explanation for why this problem was intractable for such a long time. Erwin Pesch, Ulrich A. W. Tetzlaff |
INFORMS J. Comput. | 2 |