Demo Data from EDBT 2026 / reviewers in the wild / expert
Eric Max
dblp:139/7716
· DBLP profile ↗
2ranked-venue papers
0as first author
0since 2021 · last 1990
—ORCID · none
Domains — the database's venue-derived domains; a paper can count in several
Artificial intelligence and machine learning · 1Systems, architecture and hardware · 1Applied, interdisciplinary, general and emerging computing · 1
Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.
| Theoretical computer science
2 papers |
Mathematical optimization · 100% |
Topics — the 4 heaviest of 4, each with the papers that count most for it
| Topic | Weight | Papers | Last | Evidence papers |
|---|---|---|---|---|
Mathematical optimization › scheduling
parallel machine scheduling |
0.0 | 1 | 1990 | Schedule generation and reconfiguration for parallel machines · IEEE Trans. Robotics Autom. 1990 |
Mathematical optimization › scheduling
production scheduling |
0.0 | 1 | 1990 | Schedule generation and reconfiguration for parallel machines · IEEE Trans. Robotics Autom. 1990 |
Mathematical optimization
lagrangian relaxation |
0.0 | 2 | 1990 | Schedule generation and reconfiguration for parallel machines · IEEE Trans. Robotics Autom. 1990 Schedule generation and reconfiguration for parallel machines · ICRA 1989 |
Mathematical optimization
discrete optimization |
0.0 | 1 | 1989 | Schedule generation and reconfiguration for parallel machines · ICRA 1989 |
Methods — techniques the papers use, named apart from their topics
lagrangian relaxation · 0.0near-optimal algorithm · 0.0heuristic · 0.0
| Year | Publication | Venue | Position |
|---|---|---|---|
| 1990 | Schedule generation and reconfiguration for parallel machinesabstractA methodology for scheduling independent jobs with due dates on identical, parallel machines is presented. The jobs have different levels of importance and various processing times on the machines, and the objective is to minimize the total weighted job tardiness of the schedule. Since the problem is NP hard, the goal is not to obtain the optimal schedule. Rather, an efficient near-optimal algorithm based on Lagrangian relaxation is presented. This approach provides a lower bound on the cost, which can be used as a measure of suboptimality. According to an implementation for a work center at Pratt and Whitney, most schedules generated are within 1% of the optima with reasonable CPU times. Furthermore, the method provides valuable job interaction information, which shop floor management uses to answer 'what if' questions, to reconfigure the schedule to accommodate dynamic changes, and to schedule new jobs.> Peter B. Luh, Debra J. Hoitomt, Eric Max, Krishna R. Pattipati |
IEEE Trans. Robotics Autom. | 3 |
| 1989 | Schedule generation and reconfiguration for parallel machinesabstractThe authors present a methodology for scheduling independent jobs with due dates on identical parallel machines. The jobs have different levels of importance and various processing times on the machines, and the objective is to minimize the total weighted job tardiness of the schedule. Since the problem is NP-hard, the goal is not to obtain the optimal schedule. Rather, an efficient near-optimal algorithm based on Lagrangian relaxation is presented. A nice feature of this approach is that it provides a lower bound on the cost, which can be used as a measure of suboptimality. On most problems tested, results are within 1% of the optima and have reasonable CPU times. Furthermore, the method provides job interaction information, which is then used to provide quick answers to 'what if' questions, to reconfigure the schedule to accommodate dynamic changes, and also to schedule jobs.> Peter B. Luh, Debra J. Hoitomt, Eric Max, Krishna R. Pattipati |
ICRA | 3 |