EDBT 2026 Demo / reviewers in the wild / expert
Anabela Tereso
dblp:141/6111 · also Anabela Pereira Tereso
· DBLP profile ↗
42ranked-venue papers
4as first author
19since 2021 · last 2026
0000-0001-9802-0074ORCID · verified
Domains — the database's venue-derived domains; a paper can count in several
Applied, interdisciplinary, general and emerging computing · 37 · 3 first-author · 16 since 2021Artificial intelligence and machine learning · 4 · 1 first-author · 2 since 2021Software engineering, systems software and programming languages · 1 · 1 since 2021Human-computer interaction and ubiquitous computing · 1
| Year | Publication | Venue | Position |
|---|---|---|---|
| 2026 | A GenAI-Driven Multi-Agent Framework for Explainable Intent-Based Slice Recommendation
Rui Ferreira 0001, Raul Barbosa, Marco Araújo, Petia Georgieva, Susana Sargento, Anabela Tereso, Paulo Novais, Pedro Rito, Bruno Mendes |
NetSoft | 6 |
| 2026 | Proposal of Performance Indicators for the iPower Project Management Platform of Bosch Car Multimedia: A Case Study
Bruno Vilas Boas, Anabela Tereso |
WorldCIST (3) | 2 |
| 2026 | Dynamic Project Allocation Approach for ANI's Incentive System
C. S. Duarte, Anabela Tereso, José António Oliveira 0001 |
WorldCIST (2) | 2 |
| 2026 | Driving Project Management Innovation: a Case Study on Integrating PMBOK, Scrum and Backplanning in Construction
Lucas Goncalves, Anabela Tereso, João Pedro Couto 0002 |
WorldCIST (3) | 2 |
| 2026 | Development of a Communication Plan for the Portuguese Project Management Observatory (OPGP)
Tiago Lopes, Anabela Tereso |
WorldCIST (3) | 3 |
| 2025 | Comparative Analysis of Large-Scale Agile Project Management Frameworks: A Systematic Literature Review Based on PRISMA
Sara Mendes, Marco Esteves, Anabela Tereso, Francisco J. Duarte |
WorldCIST (2) | 3 |
| 2025 | A Metaheuristic Approach to Project and Multi-project Scheduling: A Case Study
Filipe Ribeiro, André S. Santos 0001, Anabela Tereso |
WorldCIST (1) | 3 |
| 2024 | Proposal to Improve Risk Management in New Product Development Projects in an Automotive Company
Inês Laranjeiro, Anabela Tereso, João Faria |
WorldCIST (3) | 2 |
| 2024 | Improving Change Management in Large Engineering Projects: A Case Study
Anabela Tereso, Cláudio Santos |
WorldCIST (3) | 2 |
| 2023 | Allocation Model for Workload Balance: A Case Study
Rita Guerreiro, Guilherme Santos, André S. Santos 0001, Anabela Tereso |
HIS (4) | 4 |
| 2023 | Load Balancing in Parallel Machines: A Literature Review
Guilherme Santos, Rita Guerreiro, André S. Santos 0001, Anabela Tereso, José António Oliveira 0001, João Bastos |
HIS (2) | 4 |
| 2023 | Implementing an Agile Project Management Methodology on a Minimum Viable Product Development
Danna Dias, Anabela Tereso, Ingrid Souza |
WorldCIST (3) | 2 |
| 2023 | Application of the PM2 Programme Management Methodology to the Portuguese Project Management Observatory
Vânia Novo, Anabela Tereso, Sofia Ribeiro-Lopes, Pedro Engrácia |
WorldCIST (3) | 2 |
| 2022 | Project Management in Service Sector SMEs: A Comparative Study Between Portugal and Denmark
Giselle Ferreira, Anabela Tereso, Gabriela Fernandes |
WorldCIST (3) | 2 |
| 2022 | Innovation and Sustainability Practices in Project Management Within SMEs Context - A Systematic Literature Review
Orlando Lima, Anabela Tereso, Gabriela Fernandes |
WorldCIST (3) | 2 |
| 2022 | Application of Scheduling and Capacity Management Tools in a Multi-project Environment
Leandro Pinto, Alberto Pereira, Anabela Tereso, Marlene Brito |
WorldCIST (3) | 3 |
| 2021 | A Project Management Hybrid Model of Software Development in an Academic Environment
Cláudia Dinis, Pedro Ribeiro 0001, Anabela Tereso |
WorldCIST (2) | 3 |
| 2021 | Critical Management Risks in Collaborative University-Industry R&D Programs
Gabriela Fernandes, Joana Domingues, Anabela Tereso, Eduardo B. Pinto |
WorldCIST (2) | 3 |
| 2021 | Project Management Practice in SMEs: A Comparative Study of the Portuguese and Danish Economic Context
Cristiano Seiji Watanabe, Anabela Tereso, Aldora Gabriela Gomes Fernandes, Lars Jespersen, Jens Vestgaard |
WorldCIST (2) | 2 |
| 2020 | A Capacity Management Tool for a Portfolio of Industrialization Projects
Caio Lima, Anabela Tereso, Madalena Araújo |
WorldCIST (1) | 2 |
| 2020 | Improving Project Management Practices in a Software Development Team
Sara Pires, Anabela Tereso, Gabriela Fernandes |
WorldCIST (1) | 2 |
| 2020 | Communication in Project Management: An Action Research Approach in an Automotive Manufacturing Company
Ingrid Souza, Anabela Tereso, Diana Mesquita |
WorldCIST (1) | 2 |
| 2019 | Improvement of Industrialization Projects Management: An Automotive Industry Case Study
Diana Fernandes, Anabela Tereso, Gabriela Fernandes |
WorldCIST (1) | 2 |
| 2019 | The Importance of Project Management Competences: A Case Study in Public Administration
Eliane Gonzales Meirelles, Anabela Tereso, Cláudio Santos |
WorldCIST (1) | 2 |
| 2019 | Project Management Practices at Portuguese Startups
Anabela Tereso, Celina Pinto Leão, Tobias Ribeiro |
WorldCIST (1) | 1 |
| 2018 | Knowledge Sharing in Industrialization Project Management Practices
Anabela Tereso, João Faria, Teresa Ruão |
WorldCIST (1) | 2 |
| 2018 | Development of an Interface for Managing and Monitoring Projects in an Automotive Company
Andreia Reis, Anabela Tereso, Cláudio Santos, Jorge Coelho 0002 |
WorldCIST (1) | 2 |
| 2018 | Development of a Grooming Process for an Agile Software Team in the Automotive Domain
Francisca Ribeiro, André L. Ferreira, Anabela Tereso, Deborah Perrotta |
WorldCIST (1) | 3 |
| 2017 | Improving Project Management Practices in Architecture & Design Offices
Cátia Sousa, Anabela Tereso, Aldora Gabriela Gomes Fernandes |
WorldCIST (2) | 2 |
| 2017 | Integration Between EVM and Risk Management: Proposal of an Automated Framework
Anabela Tereso, Pedro Ribeiro 0001, Manuel Cardoso |
WorldCIST (2) | 1 |
| 2016 | Implementation of Multiple Criteria Decision Analysis Approaches in the Supplier Selection Process: A Case Study
Dmitry Kisly, Anabela Tereso, Maria Sameiro Carvalho |
WorldCIST (1) | 2 |
| 2016 | Multiple Case Study of the Supplier Selection Decision Process
Dmitry Kisly, Anabela Tereso, Maria Sameiro Carvalho |
WorldCIST (1) | 2 |
| 2015 | A Multi-Criteria Decision Support System for a Routing Problem in Waste Collection
João A. Ferreira, Anabela Tereso, José António Oliveira 0001 |
EMO (2) | 3 |
| 2015 | Concurrency Detection on Finish-to-Start Activity Precedence Networks
Rui Moutinho, Anabela Tereso |
WorldCIST (1) | 2 |
| 2015 | Project Management: Evaluation of the Problems in the Portuguese Construction Industry
Leonel Rocha, Anabela Tereso, João Pedro Couto 0002 |
WorldCIST (1) | 2 |
| 2015 | OPM3® Portugal Project - Information Systems and Technologies Organizations - Outcome Analysis
Anabela Tereso, Aldora Gabriela Gomes Fernandes, Isabel Loureiro, José Ângelo Pinto |
WorldCIST (1) | 2 |
| 2015 | BeSmart2: A Multicriteria Decision Aid Application
Anabela Tereso, João Amorim |
WorldCIST (1) | 1 |
| 2014 | Detection of Gait Events and Assessment of Fall Risk Using Accelerometers in Assisted GaitabstractThe use of the walker in rehabilitation has increased in the past few years. Therapists evaluate patient's rehabilitation by observation and subjective tests. Thus, it is necessary the use of an assistive tool which can measure and quantify the patient's walker-assisted movement and stability, providing an objective clinical assessment. The aim of this study is to detect differences in assisted gait when using the assistive devices (ADs) - crutches, standard walker and rollator (4-wheeled walker) with forearm supports (RFS) - in patients with knee osteoarthritis (KOA) that suffered the surgery - Total Knee Arthroplasty (TKA). Additionally, it is to verify the link between gait parameters and acceleration signals. The evaluation is reached by the use of two 3 axis-accelerometers. The signals extracted from the sensors, at the ankle and trunk, are related to gait events and evaluation of fall risk, respectively. Results show that despite the differences between the signals obtained with the three ADs and with the subjects in this study, it is possible to identify effectively the gait parameters and prove the stability that the RFS provides. Anabela Tereso, Mariam Martins, Cristina P. Santos 0001, M. Vieira da Silva, Luis Gonçalves, Leonel Rocha |
ICINCO (1) | 1 |
| 2014 | The Key Project Managers' Competences for Different Types of Projects
Margarida Dias, Anabela Tereso, Ana Cristina Braga, Aldora Gabriela Gomes Fernandes |
WorldCIST (1) | 2 |
| 2014 | Software Tools for Project Management - Focus on Collaborative Management
Maria Ester Ferreira, Anabela Tereso |
WorldCIST (2) | 2 |
| 2014 | An Application to Select Collaborative Project Management Software Tools
Juliana Oliveira, Anabela Tereso, Ricardo J. Machado 0001 |
WorldCIST (1) | 2 |
| 2013 | Standardization of Processes Applying CMMI Best Practices
Vítor Serrano, Anabela Tereso, Pedro Ribeiro 0001, Miguel A. Brito |
WorldCIST | 2 |