Demonstration venue · read-only. Every page can be browsed; the buttons that would change it are switched off. Create an account to run TaxoReview on your own data. A simulation from public publication records: the people listed were not invited and did not agree to review.
? Tutorial for this page

Mitchell H. Burman

dblp:144/5155 · DBLP profile ↗
← Back
1ranked-venue papers
1as first author
0since 2021 · last 1992
—ORCID · none

Domains — the database's venue-derived domains; a paper can count in several

Artificial intelligence and machine learning · 1 · 1 first-authorSystems, architecture and hardware · 1 · 1 first-author

Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.

Theoretical computer science
1 paper
Mathematical optimization · 100%

Topics — the 1 heaviest of 2, each with the papers that count most for it

TopicWeightPapersLastEvidence papers
Mathematical optimization › scheduling
production scheduling
0.011992
An algorithm for the scheduling of setups and production to meet due dates · ICRA 1992

Methods — techniques the papers use, named apart from their topics

real-time control · 0.0closed-loop production control · 0.0
YearPublicationVenuePosition
1992 An algorithm for the scheduling of setups and production to meet due dates
abstract
A closed-loop production control algorithm for a medical device manufacturing facility of an international healthcare conglomerate with due dates, significant setup times, and random disruptions is proposed. The algorithm is problem driven, exploits a hierarchical setup structure, and uses real-time control. The algorithm has been reduced to a set of simplistic rules with which floor management feels comfortable. The purpose of this research is to provide the theoretical underpinnings of those simple rules.>
Mitchell H. Burman, Stanley B. Gershwin
ICRA1