EDBT 2026 Demo / reviewers in the wild / expert
Marek Vlk
dblp:167/9943
· DBLP profile ↗
6ranked-venue papers
3as first author
0since 2021 · last 2020
0000-0003-4925-0812ORCID · verified
Domains — the database's venue-derived domains; a paper can count in several
Artificial intelligence and machine learning · 4 · 1 first-authorSystems, architecture and hardware · 1 · 1 first-authorComputer networks · 1 · 1 first-authorGraphics, computer vision, multimedia, augmented reality and games · 1
Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.
| Artificial intelligence
1 paper |
Planning, search and constraint satisfaction · 100% | |
| Computer architecture, parallel and distributed computing, and storage systems
1 paper |
Embedded and real-time systems · 100% | |
| Computer networks
1 paper |
Internet architecture and protocols · 100% |
Topics — the 3 heaviest of 4, each with the papers that count most for it
| Topic | Weight | Papers | Last | Evidence papers |
|---|---|---|---|---|
Embedded and real-time systems › real-time communication
real-time networks |
0.4 | 1 | 2020 | Enhancing Schedulability and Throughput of Time-Triggered Traffic in IEEE 802.1Qbv Time-Sensitive Networks · IEEE Trans. Commun. 2020 |
Knowledge, reasoning and agents › Planning, search and constraint satisfaction
multi-agent path finding |
0.4 | 1 | 2019 | Online Multi-Agent Pathfinding · AAAI 2019 |
Knowledge, reasoning and agents › Planning, search and constraint satisfaction › multi-agent path finding
online multi-agent pathfinding |
0.4 | 1 | 2019 | Online Multi-Agent Pathfinding · AAAI 2019 |
Methods — techniques the papers use, named apart from their topics
schedulability analysis · 0.9formal proof · 0.9algorithm benchmarking · 0.9online algorithm · 0.4
| Year | Publication | Venue | Position |
|---|---|---|---|
| 2020 | Enhancing Schedulability and Throughput of Time-Triggered Traffic in IEEE 802.1Qbv Time-Sensitive NetworksabstractThanks to the standards being developed by IEEE Time-Sensitive Networking (TSN) Task Group, the classical IEEE 802.1 Ethernet architecture is now enhanced to accommodate real-time and safety-critical requirements emerging in various cyber-physical systems. The deterministic nature of the communication is achieved through the time-triggered traffic, which requires introducing strict scheduling constraints that may be an obstacle in finding a feasible schedule. In this article, we propose a simple hardware enhancement of a switch along with a relaxed scheduling constraint that increases schedulability and throughput of the time-triggered traffic but maintains the deterministic nature and timeliness guarantees in a TSN network. We give a formal proof to justify the claims and an algorithm benchmarking and experimental validation to demonstrate the gains. The results show that the number of flows that can be scheduled in the model with the relaxed constraint is on average by 75.1 % larger than in the traditional model. Marek Vlk, Zdenek Hanzálek, Katerina Brejchová, Siyu Tang 0002, Sushmit Bhattacharjee, Songwei Fu |
IEEE Trans. Commun. | 1 |
| 2019 | Online Multi-Agent PathfindingabstractMulti-agent pathfinding (MAPF) is the problem of moving a group of agents to a set of target destinations while avoiding collisions. In this work, we study the online version of MAPF where new agents appear over time. Several variants of online MAPF are defined and analyzed theoretically, showing that it is not possible to create an optimal online MAPF solver. Nevertheless, we propose effective online MAPF algorithms that balance solution quality, runtime, and the number of plan changes an agent makes during execution. Jiri Svancara, Marek Vlk, Roni Stern, Dor Atzmon, Roman Barták |
AAAI | 2 |
| 2019 | Makespan Minimization with Sequence-dependent Non-overlapping SetupsabstractThis paper deals with a scheduling problem that emerges in the production of water tubes of different sizes that require reconfiguration of the machines. The reconfiguration of the machines leads to the notion of sequence-dependent setup times between tasks. These setups are often performed by a single person who cannot serve more than one machine at the same moment, i.e., the setups must not overlap. Surprisingly, the problem with non-overlapping setups has received only a little attention so far. To solve this problem, we propose an Integer Linear Programming formulation, Constraint Programming models and a hybrid heuristic that leverages the strength of Integer Linear Programming in the shortest Hamiltonian path problem and the efficiency of Constraint Programming at sequencing problems with makespan minimization. The experimental evaluation shows that among the proposed exact approaches, the Constraint Programming is a superior method being able to solve instances with 3 machines and up to 11 tasks on each machine to optimality within a few seconds. The proposed hybrid heuristic attains high-quality solutions for instances with 50 machines and up to 116 tasks on each machine. Marek Vlk, Antonín Novák, Zdenek Hanzálek |
ICORES | 1 |
| 2018 | Energy-Aware Production Scheduling with Power-Saving Modes
Ondrej Benedikt, Premysl Sucha, István Módos, Marek Vlk, Zdenek Hanzálek |
CPAIOR | 4 |
| 2017 | Minimization of useless work in resource failure recovery of workflow schedulesabstractReal-life scheduling has to face many difficulties such as dynamics of manufacturing environments with unforeseen events occurring during the execution of a schedule. Namely, in the case of a resource failure, it may be necessary to process a lot of work again, or a feasible schedule recovery may not exist at all. Moreover, the time window within which the ongoing schedule must be updated may be very short, and too timeconsuming computation of the schedule may lead to a failure of the scheduling mechanism and setback in production. Our approach in the area of predictive-reactive scheduling is to allow for substitution of tasks, which cannot be executed, with a set of alternative tasks. This paper makes use of the model of the hierarchical workflows and gives an SMT and a CSP models to recover an ongoing schedule from a resource failure with the objective to minimize the work processed in vain. The experimental analysis identified parameters for which the SMT model clearly outperforms the CSP model and vice versa. Marek Vlk, Roman Barták, Zdenek Hanzálek |
ETFA | 1 |
| 2015 | Reactive Recovery from Machine Breakdown in Production Scheduling with Temporal Distance and Resource Constraints
Roman Barták, Marek Vlk |
ICAART (2) | 2 |