EDBT 2026 Demo / reviewers in the wild / expert
Radu-Alexandru Todor
dblp:215/4907
· DBLP profile ↗
1ranked-venue papers
0as first author
0since 2021 · last 2020
—ORCID · none
Domains — the database's venue-derived domains; a paper can count in several
Databases, data management, data science and information retrieval · 1
Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.
| Databases, data mining, and information retrieval
1 paper |
Graph data management · 61% Database system architecture and tuning · 30% Query processing and optimization · 9% |
Topics — the 4 heaviest of 4, each with the papers that count most for it
| Topic | Weight | Papers | Last | Evidence papers |
|---|---|---|---|---|
Graph data management › graph algorithms
connected components |
0.4 | 1 | 2020 | In-database connected component analysis · ICDE 2020 |
Graph data management
graph analytics |
0.4 | 1 | 2020 | In-database connected component analysis · ICDE 2020 |
Database system architecture and tuning › parallel database system
massively parallel processing database |
0.4 | 1 | 2020 | In-database connected component analysis · ICDE 2020 |
Query processing and optimization
SQL query processing |
0.1 | 1 | 2020 | In-database connected component analysis · ICDE 2020 |
Methods — techniques the papers use, named apart from their topics
randomized algorithm · 0.4SQL · 0.4
| Year | Publication | Venue | Position |
|---|---|---|---|
| 2020 | In-database connected component analysisabstractWe describe a Big Data-practical, SQL-implementable algorithm for efficiently determining connected components for graph data stored in a Massively Parallel Processing (MPP) relational database. The algorithm described is a linear-space, randomised algorithm, always terminating with the correct answer but subject to a stochastic running time, such that for any ε > 0 and any input graph G = 〈V,E〉 the algorithm terminates after O(log|V |) SQL queries with probability of at least 1 - ε, which we show empirically to translate to a quasi-linear runtime in practice. Harald Bögeholz, Michael Brand, Radu-Alexandru Todor |
ICDE | 3 |