EDBT 2026 Demo / reviewers in the wild / expert
Konstantinos Dogeas
dblp:224/9030
· DBLP profile ↗
7ranked-venue papers
2as first author
5since 2021 · last 2024
0009-0001-1528-3221ORCID · corroborated
Domains — the database's venue-derived domains; a paper can count in several
Systems, architecture and hardware · 3 · 1 since 2021Theory of computation · 3 · 2 first-author · 3 since 2021Artificial intelligence and machine learning · 1 · 1 since 2021Graphics, computer vision, multimedia, augmented reality and games · 1 · 1 since 2021
| Year | Publication | Venue | Position |
|---|---|---|---|
| 2024 | Competitive Query Minimization for Stable Matching with One-Sided UncertaintyabstractWe study the two-sided stable matching problem with one-sided uncertainty for two sets of agents A and B, with equal cardinality. Initially, the preference lists of the agents in A are given but the preferences of the agents in B are unknown. An algorithm can make queries to reveal information about the preferences of the agents in B. We examine three query models: comparison queries, interviews, and set queries. Using competitive analysis, our aim is to design algorithms that minimize the number of queries required to solve the problem of finding a stable matching or verifying that a given matching is stable (or stable and optimal for the agents of one side). We present various upper and lower bounds on the best possible competitive ratio as well as results regarding the complexity of the offline problem of determining the optimal query set given full information. Evripidis Bampis, Konstantinos Dogeas, Thomas Erlebach, Nicole Megow, Jens Schlöter, Amitabh Trehan |
APPROX/RANDOM | 2 |
| 2024 | Scheduling with Obligatory TestsabstractMotivated by settings such as medical treatments or aircraft maintenance, we consider a scheduling problem with jobs that consist of two operations, a test and a processing part. The time required to execute the test is known in advance while the time required to execute the processing part becomes known only upon completion of the test. We use competitive analysis to study algorithms for minimizing the sum of completion times for $n$ given jobs on a single machine. As our main result, we prove using a novel analysis technique that the natural $1$-SORT algorithm has competitive ratio at most 1.861. For the special case of uniform test times, we show that a simple threshold-based algorithm has competitive ratio at most 1.585. We also prove a lower bound that shows that no deterministic algorithm can be better than $\sqrt{2}$-competitive even in the case of uniform test times. Konstantinos Dogeas, Thomas Erlebach, Ya-Chun Liang |
ESA | 1 |
| 2024 | Exploiting Automorphisms of Temporal Graphs for Fast Exploration and RendezvousabstractTemporal graphs are graphs where the edge set can change in each time step, and the vertex set stays the same. Exploration of temporal graphs whose snapshot in each time step is a connected graph, called connected temporal graphs, has been widely studied. We extend the concept of graph automorphisms from static graphs to temporal graphs and show that symmetries enable faster exploration: We prove that a connected temporal graph with $n$ vertices and orbit number $r$ (i.e., $r$ is the number of automorphism orbits) can be explored in $O(r n^{1+ε})$ time steps, for any fixed $ε>0$. For $r=O(n^c)$ for constant $c<1$, this is a significant improvement over the known tight worst-case bound of $Θ(n^2)$ time steps for arbitrary connected temporal graphs. We also give two lower bounds for exploration, showing that $Ω(n \log n)$ time steps are required for some inputs with $r=O(1)$ and that $Ω(rn)$ time steps are required for some inputs for any $r$ with $1\le r\le n$. The techniques we develop for fast exploration are used to derive the following result for rendezvous in connected temporal graphs: Two agents are placed by an adversary at arbitrary vertices and given full information about the temporal graph, except that they do not have consistent vertex labels. The agents can meet at a common vertex after $O(n^{1+ε})$ time steps, for any $ε>0$. For some connected temporal graphs with constant orbit number we present a complementary lower bound of $Ω(n\log n)$ time steps. Finally, we give a randomized algorithm to construct a temporal walk $W$ that visits all vertices of a given orbit with probability at least $1-ε$ for any $0<ε<1$ such that $W$ spans $O((n^{5/3}+rn)\log n)$ time steps. The runtime of this algorithm consists of $O(n^{1/3} \log (n/ε))$ linear-time scans of the snapshots that exist in this time span. Konstantinos Dogeas, Thomas Erlebach, Frank Kammer, Johannes Meintrup, William K. Moses Jr. |
ICALP | 1 |
| 2022 | Scheduling with Untrusted PredictionsabstractUsing machine-learned predictions to create algorithms with better approximation guarantees is a very fresh and active field. In this work, we study classic scheduling problems under the learning augmented setting. More specifically, we consider the problem of scheduling jobs with arbitrary release dates on a single machine and the problem of scheduling jobs with a common release date on multiple machines. Our objective is to minimize the sum of completion times. For both problems, we propose algorithms which use predictions for taking their decisions. Our algorithms are consistent -- i.e. when the predictions are accurate, the performances of our algorithms are close to those of an optimal offline algorithm--, and robust -- i.e. when the predictions are wrong, the performance of our algorithms are close to those of an online algorithm without predictions. In addition, we confirm the above theoretical bounds by conducting experimental evaluation comparing the proposed algorithms to the offline optimal ones for both the single and multiple machines settings. Evripidis Bampis, Konstantinos Dogeas, Alexander V. Kononov, Giorgio Lucarelli, Fanny Pascual |
IJCAI | 2 |
| 2021 | Speed Scaling with Explorable UncertaintyabstractIn this paper, we introduce a model for the speed scaling setting in the framework of explorable uncertainty. In the model, each job has a release time, a deadline and an unknown workload that can be revealed to the algorithm only after executing a query that induces a given additional job-dependent load. Alternatively, the job may be executed without any query, but in that case its workload is equal to a given upper bound. This assumption is motivated for instance in applications like code optimization, or file compression. We study the problem of minimizing the overall energy consumption for executing all the jobs in their time windows. We also consider the related problem of minimizing the maximum speed used by the algorithm. We present lower and upper bounds for both the offline case, where all the jobs are known in advance, and the online case, where the jobs arrive over time. We start with the single machine setting and we finally deal with the more general case where multiple identical parallel machines are available. Evripidis Bampis, Konstantinos Dogeas, Alexander V. Kononov, Giorgio Lucarelli, Fanny Pascual |
SPAA | 2 |
| 2020 | Scheduling Malleable Jobs Under Topological ConstraintsabstractBleuse et al. (EuroPar 2018) introduced a general model for interference-aware scheduling in large scale parallel platforms. They considered two different types of communications: the flows induced by data exchanges during computations and the flows related to Input/Output operations. Rather than taking into account these communications explicitly, they restrict the possible allocations of a job by external topological constraints. In their work, jobs are considered to be rigid: a job requires a specific number of machines in order to be executed. Here, we first adopt the same framework for the platform and the aforementioned topological constraints. We show that there is no polynomial time approximation algorithm under the rigid setting with ratio smaller than 3/2, unless P = NP. Then, we focus on the malleable setting. We show that in the proportional-malleable setting, where the work of every job remains constant independently of the number of machines on which it is executed, the scheduling problem remains NPhard even in the uniform case, where the maximum number of machines is the same for all the jobs. Then, we propose a 2-approximation algorithm for this case. Furthermore, we present an approximation algorithm solving the more general case where the maximum number of machines is job-dependent and the work of the jobs is increasing with respect to the number of used machines, due to the communication overhead. Evripidis Bampis, Konstantinos Dogeas, Alexander V. Kononov, Giorgio Lucarelli, Fanny Pascual |
IPDPS | 2 |
| 2018 | Interference-Aware Scheduling Using Geometric Constraints
Raphaël Bleuse, Konstantinos Dogeas, Giorgio Lucarelli, Grégory Mounié, Denis Trystram |
Euro-Par | 2 |