Jinjiang Yuan

dblp:23/5997 · DBLP profile ↗
← Back
56ranked-venue papers
2as first author
10since 2021 · last 2026
0000-0002-9814-615XORCID · corroborated

Domains — the database's venue-derived domains; a paper can count in several

Theory of computation · 53 · 2 first-author · 10 since 2021Databases, data management, data science and information retrieval · 12Systems, architecture and hardware · 1Security and privacy · 1
YearPublicationVenuePosition
2026 Even cycles and perfect matchings in planar graphs
Xiumei Wang 0001, Jinjiang Yuan, Chi To Ng 0001, T. C. E. Cheng
Discret. Appl. Math.3
2025 Sufficient conditions for k-factors and spanning trees of graphs
Guoyan Ao, Ruifang Liu, Jinjiang Yuan, Chi To Ng 0001, T. C. E. Cheng
Discret. Appl. Math.3
2025 Unary NP-hardness of transportation and batching scheduling to minimize the total weighted completion time
Hongjun Wei, Jinjiang Yuan
Discret. Appl. Math.3
2025 Claw-free minimal matching covered graphs
Yipei Zhang, Xiumei Wang 0001, Jinjiang Yuan, Chi To Ng 0001, T. C. E. Cheng
Discret. Appl. Math.3
2024 Properly colored cycles in edge-colored 2-colored-triangle-free complete graphs
Fei Huang 0007, Jinjiang Yuan, Chi To Ng 0001, T. C. E. Cheng
Discret. Appl. Math.3
2022 Improved sufficient conditions for k-leaf-connected graphs
Guoyan Ao, Ruifang Liu, Jinjiang Yuan
Discret. Appl. Math.3
2022 Bicritical graphs without removable edges
Yipei Zhang, Xiumei Wang 0001, Jinjiang Yuan
Discret. Appl. Math.3
2022 A note on LP-based approximation algorithms for capacitated facility location problem
Runjie Miao, Jinjiang Yuan
Theor. Comput. Sci.2
2021 Unary NP-hardness of preemptive scheduling to minimize total completion time with release times and deadlines
Rubing Chen, Jinjiang Yuan
Discret. Appl. Math.2
2021 Scheduling to tradeoff between the number and the length of accepted jobs
Qiulan Zhao, Jinjiang Yuan
Theor. Comput. Sci.2
2020 A Short Note on Open-Neighborhood Conflict-Free Colorings of Graphs
abstract
A graph is said to be open-neighborhood conflict-free $k$-colorable if there exists an assignment of $k$ different colors to some of the vertices such that, for every vertex $v$, there is a color that is assigned to exactly one vertex among the neighbors of $v$. The open-neighborhood conflict-free chromatic number $\chi _O(G)$ is the smallest $k$ for which $G$ is open-neighborhood conflict-free $k$-colorable. Z. Abel et al., [ SIAM J. Discrete Math. 32 (2018), pp. 2675--2702] showed that $\chi _O(G)\leq 8$ for every planar graph $G$ and posed two open problems to ask whether $\chi _O(G)\leq 4$ for every planar graph $G$ and whether $\chi _O(G)\leq 3$ for every outerplanar graph $G$. We present in this paper positive answers for the above two open problems by establishing a stronger result which states that, for every integer $k\ge 2$, every minor-$k$-colorable graph is open-neighborhood conflict-free $k$-colorable, where a graph $G$ is said to be minor-$k$-colorable if every minor of $G$ is $k$-colorable.
Fei Huang 0007, Jinjiang Yuan
SIAM J. Discret. Math.3
2019 Proper vertex-pancyclicity of edge-colored complete graphs without monochromatic triangles
Xiaozheng Chen, Fei Huang 0007, Jinjiang Yuan
Discret. Appl. Math.3
2019 On strong proper connection number of cubic graphs
Fei Huang 0007, Jinjiang Yuan
Discret. Appl. Math.2
2019 Paths and trails in edge-colored weighted graphs
Runjie Miao, Jinjiang Yuan, Fei Huang 0007
Theor. Comput. Sci.2
2018 Single-machine scheduling with operator non-availability to minimize total weighted completion time
Long Wan, Jinjiang Yuan
Inf. Sci.2
2017 Pareto optimization for the two-agent scheduling problems with linear non-increasing deterioration based on Internet of Things
Long Wan, Lijun Wei, Naixue Xiong, Jinjiang Yuan, Jiacai Xiong
Future Gener. Comput. Syst.4
2016 Two-stage scheduling on identical machines with assignable delivery times to minimize the maximum delivery completion time
abstract
In this paper, we consider the two-stage scheduling problem in which n jobs are first processed on m identical machines at a manufacturing facility and then delivered to their customers by one vehicle which can deliver one job at each shipment. In the problem, a set of n delivery times is given in advance, and in a schedule, the n delivery times should be assigned to the n jobs, respectively. The objective is to minimize the maximum delivery completion time, i.e., the time when all jobs are delivered to their respective customers and the vehicle returns to the facility. For this problem, we present a 32-approximation algorithm and a polynomial-time approximation scheme.
Youjun Chen, Lingfa Lu, Jinjiang Yuan
Theor. Comput. Sci.3
2016 Online scheduling on the unbounded drop-line batch machines to minimize the maximum delivery completion time
Ji Tian, Ruyan Fu, Jinjiang Yuan
Theor. Comput. Sci.4
2015 Unary NP-hardness of minimizing the total deviation with generalized or assignable due dates
Jinjiang Yuan
Discret. Appl. Math.2
2015 A note on unbounded parallel-batch scheduling
Zhichao Geng, Jinjiang Yuan
Inf. Process. Lett.2
2015 Preemptive scheduling on identical machines with delivery coordination to minimize the maximum delivery completion time
Youjun Chen, Lingfa Lu, Jinjiang Yuan
Theor. Comput. Sci.3
2015 Pareto optimization scheduling of family jobs on a p-batch machine to minimize makespan and maximum lateness
Zhichao Geng, Jinjiang Yuan
Theor. Comput. Sci.2
2015 Single-machine batch scheduling with job processing time compatibility
T. C. E. Cheng, Chi To Ng 0001, Jinjiang Yuan
Theor. Comput. Sci.4
2014 Online scheduling on an unbounded parallel-batch machine and a standard machine to minimize makespan
Ruyan Fu, Ji Tian, Jinjiang Yuan
Inf. Process. Lett.3
2014 Online scheduling of incompatible unit-length job families with lookahead
Jinjiang Yuan, Sufang Yang
Theor. Comput. Sci.2
2014 Online scheduling of equal length jobs on a bounded parallel batch machine with restart or limited restart
Hailing Liu, Jinjiang Yuan
Theor. Comput. Sci.2
2014 Primary-secondary bicriteria scheduling on identical machines to minimize the total completion time of all jobs and the maximum T-time of all machines
Long Wan, Jinjiang Yuan
Theor. Comput. Sci.3
2013 Online scheduling on a single machine with rejection under an agreeable condition to minimize the total completion time plus the total rejection cost
Jinjiang Yuan
Inf. Process. Lett.2
2012 An improved on-line algorithm for single parallel-batch machine scheduling with delivery times
Ji Tian, T. C. E. Cheng, Chi To Ng 0001, Jinjiang Yuan
Discret. Appl. Math.4
2012 Online scheduling of equal-length jobs with incompatible families on multiple batch machines to maximize the weighted number of early jobs
Zhenkun Zhang, Hailing Liu, Jinjiang Yuan
Inf. Process. Lett.4
2012 A best possible online algorithm for scheduling equal-length jobs on two machines with chain precedence constraints
Junling Yuan, Jinjiang Yuan
Theor. Comput. Sci.3
2011 Best semi-online algorithms for unbounded parallel batch scheduling
Jinjiang Yuan, Chi To Ng 0001, T. C. E. Cheng
Discret. Appl. Math.1
2011 Online scheduling on unbounded parallel-batch machines to minimize maximum flow-time
Jinjiang Yuan
Inf. Process. Lett.2
2011 Unbounded parallel-batch scheduling with family jobs and delivery coordination
Jinjiang Yuan, Baoqiang Fan
Inf. Process. Lett.2
2011 An on-line algorithm for the single machine unbounded parallel-batching scheduling with large delivery times
Ji Tian, Ruyan Fu, Jinjiang Yuan
Inf. Process. Lett.3
2011 Online scheduling on unbounded parallel-batch machines with incompatible job families
Ji Tian, T. C. E. Cheng, Chi To Ng 0001, Jinjiang Yuan
Theor. Comput. Sci.4
2010 Online scheduling on two parallel-batching machines with limited restarts to minimize the makespan
Ruyan Fu, T. C. E. Cheng, Chi To Ng 0001, Jinjiang Yuan
Inf. Process. Lett.4
2010 Parallel-machine scheduling with deteriorating jobs and rejection
Jinjiang Yuan
Theor. Comput. Sci.2
2010 Preemptive scheduling with simple linear deterioration on a single machine
Chi To Ng 0001, T. C. E. Cheng, Jinjiang Yuan
Theor. Comput. Sci.4
2010 Single-machine scheduling under the job rejection constraint
Liqi Zhang, Lingfa Lu, Jinjiang Yuan
Theor. Comput. Sci.3
2009 A DP algorithm for minimizing makespan and total completion time on a series-batching machine
Yixun Lin, Jinjiang Yuan
Inf. Process. Lett.3
2009 Online scheduling on unbounded parallel-batch machines to minimize the makespan
Ji Tian, T. C. E. Cheng, Chi To Ng 0001, Jinjiang Yuan
Inf. Process. Lett.4
2009 Scheduling with families of jobs and delivery coordination under job availability
Jinjiang Yuan
Theor. Comput. Sci.2
2009 Online scheduling of unit length jobs on a batching machine to maximize the number of early jobs with lookahead
Jinjiang Yuan, Jianfa Cao, Hailin Bu
Theor. Comput. Sci.2
2009 Single machine parallel-batch scheduling with deteriorating jobs
Xianglai Qi, Shiguo Zhou, Jinjiang Yuan
Theor. Comput. Sci.3
2009 A best online algorithm for scheduling on two parallel batch machines
Ji Tian, Ruyan Fu, Jinjiang Yuan
Theor. Comput. Sci.3
2008 Single machine scheduling with release dates and job delivery to minimize the makespan
Lingfa Lu, Jinjiang Yuan, Liqi Zhang
Theor. Comput. Sci.2
2008 The unbounded parallel batch machine scheduling with release dates and rejection to minimize makespan
Lingfa Lu, Liqi Zhang, Jinjiang Yuan
Theor. Comput. Sci.3
2008 A best on-line algorithm for single machine scheduling with small delivery times
Ji Tian, Ruyan Fu, Jinjiang Yuan
Theor. Comput. Sci.3
2007 Online scheduling in a parallel batch processing system to minimize makespan using restarts
Ruyan Fu, Ji Tian, Jinjiang Yuan, Yixun Lin
Theor. Comput. Sci.3
2007 Bicriteria scheduling on a batching machine to minimize maximum lateness and makespan
Yixun Lin, Jinjiang Yuan
Theor. Comput. Sci.3
2007 On-line scheduling with delivery time on a single batch machine
Ji Tian, Ruyan Fu, Jinjiang Yuan
Theor. Comput. Sci.3
2006 A Note of Perfect Nonlinear Functions
Xiyong Zhang, Hua Guo 0001, Jinjiang Yuan
CANS3
2006 Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs
T. C. E. Cheng, Chi To Ng 0001, Jinjiang Yuan
Theor. Comput. Sci.3
2004 The unbounded single machine parallel batch scheduling problem with family jobs and release dates to minimize makespan
Jinjiang Yuan, Zhaohui Liu 0001, Chi To Ng 0001, T. C. E. Cheng
Theor. Comput. Sci.1
2002 Strong NP-hardness of the single machine multi-operation jobs total completion time scheduling problem
Chi To Ng 0001, T. C. E. Cheng, Jinjiang Yuan
Inf. Process. Lett.3