Demonstration venue · read-only. Every page can be browsed; the buttons that would change it are switched off. Create an account to run TaxoReview on your own data. A simulation from public publication records: the people listed were not invited and did not agree to review.
? Tutorial for this page

Frank Keenan

dblp:25/1449 · DBLP profile ↗
← Back
18ranked-venue papers
6as first author
0since 2021 · last 2020
—ORCID · none

Domains — the database's venue-derived domains; a paper can count in several

Software engineering, systems software and programming languages · 17 · 5 first-authorArtificial intelligence and machine learning · 1Human-computer interaction and ubiquitous computing · 1 · 1 first-author

Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.

Software engineering, system software, and programming languages
1 paper
Requirements engineering and software design · 77% Software maintenance and evolution · 23%

Topics — the 2 heaviest of 2, each with the papers that count most for it

TopicWeightPapersLastEvidence papers
Requirements engineering and software design
software process
0.012004
Agile Process Tailoring and probLem analYsis (APTLY) · ICSE 2004
Software maintenance and evolution
software process improvement
0.012004
Agile Process Tailoring and probLem analYsis (APTLY) · ICSE 2004
YearPublicationVenuePosition
2020 Improving Multi-domain Stakeholder Communication of Embedded Safety-critical Development using Agile Practices: Expert Review
Surafel Demissie, Frank Keenan, Róisín Loughran, Fergal McCaffery
MODELSWARD2
2016 Investigating the Suitability of Using Agile for Medical Embedded Software Development
Surafel Demissie, Frank Keenan, Fergal McCaffery
SPICE2
2016 The MedITNet assessment framework: development and validation of a framework for improving risk management of medical IT networks
abstract
Abstract The use of networked medical devices can provide a number of benefits such as improved patient safety, a reduction in adverse events and reduced costs of care. Today, medical devices are increasingly designed for incorporation into a hospital's general IT network, which allows devices to exchange critical information. However, connecting devices in this way can introduce risks potentially negating the benefits to patients. While the IEC 80001‐1 standard has been developed to aid Healthcare Delivery Organisations (HDOs) in addressing these risks, HDOs often struggle to understand and implement the requirements. The MedITNet framework has been developed to allow HDOs to assess the capability of their risk management processes against the requirements of IEC 80001‐1. MedITNet provides a flexible assessment framework enabling HDOs to gain a greater understanding of the requirements of the standard and to improve risk management processes by determining their current state and highlighting areas for improvement. This paper examines the challenges faced by HDOs in the risk management of medical IT networks and briefly explains the components of the MedITNet framework and how the framework addresses these challenges. The use of Action Design Research (ADR) in the development and validation of MedITNet is also discussed focusing on a pilot implementation of the assessment method and expert review of the overall framework. The changes to the framework and its components as a result of the validation process are also discussed. Copyright © 2016 John Wiley & Sons, Ltd.
Silvana Togneri MacMahon, Fergal McCaffery, Frank Keenan
J. Softw. Evol. Process.3
2015 Development and validation of the MedITNet assessment framework: improving risk management of medical IT networks
abstract
The use of networked medical devices can provide a number of benefits such as improved patient safety, reduced costs of care and a reduction in adverse events. Traditionally, medical devices were placed onto a proprietary IT network provided by the manufacturer of the device. Today, medical devices are increasingly designed for incorporation into a hospital’s general IT network enabling devices to exchange critical information. However, this can introduce risks and negate the potential benefits to patients. While the IEC 80001-1 standard has been developed to aid Healthcare Delivery Organisations (HDOs) in addressing these risks, HDOs may struggle to understand and implement the requirements. The MedITNet framework has been developed to allow HDOs to assess the capability of their risk management processes against the requirements of IEC 80001-1. MedITNet provides a flexible assessment framework enabling HDOs to gain a greater understanding of the requirements of the standard and to improve risk management processes by determining their current state and highlighting areas for improvement. This paper examines the challenges faced by HDOs in the risk management of medical IT networks and briefly explains the components of the MedITNet framework and how the framework addresses these challenges. This paper also details how Action Design Research (ADR) was used in the development and validation of MedITNet.
Silvana Togneri MacMahon, Fergal McCaffery, Frank Keenan
ICSSP3
2013 Risk management of medical IT networks: an ISO/IEC 15504 compliant approach to assessment against IEC 80001-1
abstract
The incorporation of a medical device into an IT network can introduce risks that may not have been addressed during the design and manufacture of the device. IEC 80001-1 is a lifecycle risk management standard which was developed to address these risks. This paper presents research which has been performed to date which has led to the development of a Process Reference Model (PRM) and Process Assessment Model (PAM) which can be used by Healthcare Delivery Organisations to assess themselves against IEC 80001-1. This paper also presents future work in this area which includes the development of an assessment method for IEC 80001-1 and the validation of the PRM, PAM and assessment method.
Silvana Togneri MacMahon, Fergal McCaffery, Frank Keenan
ICSSP3
2013 The Approach to the Development of an Assessment Method for IEC 80001-1
Silvana Togneri MacMahon, Fergal McCaffery, Frank Keenan
SPICE3
2012 Development of a Process Assessment Model for Assessing Medical IT Networks against IEC 80001-1
Silvana Togneri MacMahon, Fergal McCaffery, Sherman Eagles, Frank Keenan, Marion Lepmets, Alain Renault
SPICE4
2011 Challenges for Requirements Development: An Industry Perspective
Sandra Kelly, Frank Keenan, Fergal McCaffery
SPICE2
2010 AnnoTestWeb/Run: Annotations Based Acceptance Testing
David Connolly, Frank Keenan, Fergal McCaffery
XP2
2010 Combining Open Space Technology (OST) with XP through Scenarios for Enhanced Requirements Elicitation
Sandra Kelly, Frank Keenan, David Connolly, Namgyal Damdul
XP2
2009 Automating Expert-Defined Tests: A Suitable Approach for the Medical Device Industry?
David Connolly, Fergal McCaffery, Frank Keenan
EuroSPI3
2009 Summary Reporting for a Linked Interaction Design-Scrum Approach: How Much Modeling Is Useful?
Frank Keenan, Namgyal Damdul, Sandra Kelly, David Connolly
XP1
2008 Building and Linking a Metaphor: Finding Value!
Frank Keenan, David W. Bustard, Namgyal Damdul, David Connolly
XP1
2008 Agile Practices in a Product Development Organization
Frank Keenan, Tony McCarron, Shay Doherty, Stuart McLean
XP1
2006 Learning project planning the agile way
Frank Keenan, Sarah Powell, Gerry Coleman, Kevin McDaid
ITiCSE1
2006 Managing Uncertainty in Agile Release Planning
Kevin McDaid, Des Greer, Frank Keenan, Paul Prior, Gerry Coleman, Philip S. Taylor
SEKE3
2005 BPUF: Big Picture Up Front
Frank Keenan, David W. Bustard
XP1
2004 Agile Process Tailoring and probLem analYsis (APTLY)
abstract
Developing software using a well-defined, well-understood process improves the likelihood of delivering a product with the required quality. Enhancing that process to meet recognised process standards, such as CMMI and ISO 9000, can further facilitate the development of complex systems in a repeatable and predictable way. There are tradeoffs involved, however. In particular, because projects differ in their scale, scope, and technical challenge, the same process will not suit all circumstances. Agile approaches to development, such as Extreme Programming (XP), SCRUM and Crystal Methodologies, recognise this dilemma and suggest that processes be tailored to each situation. The research problem for postgraduate investigation is to determine in detail how this can be achieved successfully. This will include a consideration of how best to define, maintain and give access to a knowledge base recording details of process concepts, techniques and experience.
Frank Keenan
ICSE1