Demo Data from EDBT 2026 / reviewers in the wild / expert
Guillaume Mescoff
dblp:262/3943
· DBLP profile ↗
2ranked-venue papers
1as first author
1since 2021 · last 2022
0000-0002-7665-628XORCID · corroborated
Domains — the database's venue-derived domains; a paper can count in several
Artificial intelligence and machine learning · 1Graphics, computer vision, multimedia, augmented reality and games · 1Theory of computation · 1 · 1 first-author · 1 since 2021
Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.
| Theoretical computer science
1 paper |
Mathematical optimization · 67% Computational complexity · 33% |
Topics — the 3 heaviest of 3, each with the papers that count most for it
| Topic | Weight | Papers | Last | Evidence papers |
|---|---|---|---|---|
Computational complexity
parameterized complexity |
0.4 | 1 | 2020 | The Complexity Landscape of Resource-Constrained Scheduling · IJCAI 2020 |
Mathematical optimization › scheduling › precedence constrained scheduling
resource-constrained project scheduling |
0.4 | 1 | 2020 | The Complexity Landscape of Resource-Constrained Scheduling · IJCAI 2020 |
Mathematical optimization
scheduling |
0.4 | 1 | 2020 | The Complexity Landscape of Resource-Constrained Scheduling · IJCAI 2020 |
Methods — techniques the papers use, named apart from their topics
treewidth · 0.4
| Year | Publication | Venue | Position |
|---|---|---|---|
| 2022 | A polynomial time algorithm to compute the connected treewidth of a series-parallel graph
Guillaume Mescoff, Christophe Paul, Dimitrios M. Thilikos |
Discret. Appl. Math. | 1 |
| 2020 | The Complexity Landscape of Resource-Constrained SchedulingabstractThe Resource-Constrained Project Scheduling Problem (RCPSP) and its extension via activity modes (MRCPSP) are well-established scheduling frameworks that have found numerous applications in a broad range of settings related to artificial intelligence. Unsurprisingly, the problem of finding a suitable schedule in these frameworks is known to be NP-complete; however, aside from a few results for special cases, we have lacked an in-depth and comprehensive understanding of the complexity of the problems from the viewpoint of natural restrictions of the considered instances. In the first part of our paper, we develop new algorithms and give hardness-proofs in order to obtain a detailed complexity map of (M)RCPSP that settles the complexity of all 1024 considered variants of the problem defined in terms of explicit restrictions of natural parameters of instances. In the second part, we turn to implicit structural restrictions defined in terms of the complexity of interactions between individual activities. In particular, we show that if the treewidth of a graph which captures such interactions is bounded by a constant, then we can solve MRCPSP in polynomial time. Robert Ganian, Thekla Hamm, Guillaume Mescoff |
IJCAI | 3 |