Demonstration venue · read-only. Every page can be browsed; the buttons that would change it are switched off. Create an account to run TaxoReview on your own data.

Sanjay E. Ramaswamy

dblp:37/4958 · DBLP profile ↗
← Back
3ranked-venue papers
3as first author
0since 2021 · last 1996
—ORCID · none

Domains — the database's venue-derived domains; a paper can count in several

Applied, interdisciplinary, general and emerging computing · 2 · 2 first-authorArtificial intelligence and machine learning · 1 · 1 first-authorSystems, architecture and hardware · 1 · 1 first-author

Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.

Theoretical computer science
1 paper
Mathematical optimization · 100%
Computer architecture, parallel and distributed computing, and storage systems
1 paper
Embedded and real-time systems · 100%
Artificial intelligence
1 paper
Planning, search and constraint satisfaction · 100%

Topics — the 6 heaviest of 6, each with the papers that count most for it

TopicWeightPapersLastEvidence papers
Knowledge, reasoning and agents › Planning, search and constraint satisfaction
scheduling
0.011996
Deadlock-free schedules for automated manufacturing workstations · IEEE Trans. Robotics Autom. 1996
Embedded and real-time systems › real-time scheduling › resource sharing protocols
deadlock-free scheduling
0.011996
Deadlock-free schedules for automated manufacturing workstations · IEEE Trans. Robotics Autom. 1996
Embedded and real-time systems
real-time scheduling
0.011996
Deadlock-free schedules for automated manufacturing workstations · IEEE Trans. Robotics Autom. 1996
Mathematical optimization › scheduling
job shop scheduling
0.011995
Comments on "A practical approach to job shop scheduling problems" [and reply] · IEEE Trans. Robotics Autom. 1995
Mathematical optimization
scheduling
0.011995
Comments on "A practical approach to job shop scheduling problems" [and reply] · IEEE Trans. Robotics Autom. 1995
Mathematical optimization
discrete optimization
0.011995
Comments on "A practical approach to job shop scheduling problems" [and reply] · IEEE Trans. Robotics Autom. 1995

Methods — techniques the papers use, named apart from their topics

mathematical programming · 0.0lagrangian relaxation · 0.0
YearPublicationVenuePosition
1996 Deadlock-free schedules for automated manufacturing workstations
abstract
Scheduling automated, unmanned manufacturing systems is significantly different from traditional job shops where human presence is implicitly assumed. Deadlocking has been identified as one of the critical problem in the control of automated manufacturing systems. Past approaches have been myopic in the sense that deadlock avoidance and recovery have been treated as run time problems of the system. In this paper, formulations for deadlock-free schedules are proposed and the importance of considering both material handling and buffer space availability while scheduling such an automated workstation are discussed. Extensions to the basic model and solution methods are also presented.
Sanjay E. Ramaswamy, Sanjay B. Joshi
IEEE Trans. Robotics Autom.1
1995 Comments on "A practical approach to job shop scheduling problems" [and reply]
abstract
The author states that, in the original paper (D.L. Hoitomt and P.B. Luh ibid., vol. 9, no. 1, p. 1-13, 1993), the model formulation of the scheduling problem is highly irregular. If one were to consider the formulation by itself it would seem that since neither the precedence nor processing time constraints are linked to time, we could set all /spl delta//sub ijkh/=0 and obtain a feasible solution with jobs overlapping on machines. It is noted that in the subsequent relaxation of the capacity constraint, the binary variables have been set to 1 from start to finish time of the corresponding operation to account for capacity. The need for the model formulation to include such constraints explicitly is discussed, and the original authors discuss the relevance of the comments. The existence of related and similar results in previous works is also considered.>
Sanjay E. Ramaswamy, Debra J. Hoitomt, Peter B. Luh
IEEE Trans. Robotics Autom.1
1994 Deadlock Avoidance in Automated Manufacturing Workstations - A Scheduling Approach
abstract
Scheduling automated, unmanned manufacturing systems is significantly different from traditional job shops where human presence is implicitly assumed. Deadlocking has been identified as one of the critical problem in the control of automated manufacturing systems. In this paper, formulations for deadlock-free schedules are proposed and the importance of considering both material handling and buffer space availability while scheduling such an automated workstation are discussed.>
Sanjay E. Ramaswamy, Sanjay B. Joshi
ICRA1