Demo Data from EDBT 2026 / reviewers in the wild / expert
M. I. Dessouky
dblp:41/6091
· DBLP profile ↗
1ranked-venue papers
1as first author
0since 2021 · last 1981
—ORCID · none
Domains — the database's venue-derived domains; a paper can count in several
Theory of computation · 1 · 1 first-author
Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.
| Theoretical computer science
1 paper |
Mathematical optimization · 100% |
Topics — the 5 heaviest of 5, each with the papers that count most for it
| Topic | Weight | Papers | Last | Evidence papers |
|---|---|---|---|---|
Mathematical optimization › integer programming
branch-and-bound |
0.0 | 1 | 1981 | Sequencing Jobs with Unequal Ready Times to Minimize Mean Flow Time · SIAM J. Comput. 1981 |
Mathematical optimization
combinatorial optimization |
0.0 | 1 | 1981 | Sequencing Jobs with Unequal Ready Times to Minimize Mean Flow Time · SIAM J. Comput. 1981 |
Mathematical optimization
scheduling |
0.0 | 1 | 1981 | Sequencing Jobs with Unequal Ready Times to Minimize Mean Flow Time · SIAM J. Comput. 1981 |
Mathematical optimization › scheduling › machine scheduling
single-machine scheduling |
0.0 | 1 | 1981 | Sequencing Jobs with Unequal Ready Times to Minimize Mean Flow Time · SIAM J. Comput. 1981 |
Mathematical optimization › scheduling › flow time minimization
mean flow time minimization |
0.0 | 1 | 1981 | Sequencing Jobs with Unequal Ready Times to Minimize Mean Flow Time · SIAM J. Comput. 1981 |
Methods — techniques the papers use, named apart from their topics
lower bound · 0.0implicit enumeration · 0.0branch-and-bound · 0.0
| Year | Publication | Venue | Position |
|---|---|---|---|
| 1981 | Sequencing Jobs with Unequal Ready Times to Minimize Mean Flow TimeabstractThis paper presents a procedure for sequencing a set of jobs on a single processor (machine) with the objective of minimizing the mean flow time, when the jobs may have unequal ready times. The procedure involves implicit enumeration with the branch and bound technique, coupled with some devices to improve the efficiency of the search. The devices include a sufficient optimality condition, a simple but tight lower bound and rules for tree pruning. The approach has potential applications to other sequencing problems. M. I. Dessouky, Jitender S. Deogun |
SIAM J. Comput. | 1 |