Marco Pasquali

dblp:61/6623 · DBLP profile ↗
← Back
3ranked-venue papers
2as first author
0since 2021 · last 2011
—ORCID · none

Domains — the database's venue-derived domains; a paper can count in several

Systems, architecture and hardware · 3 · 2 first-author

Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.

Computer architecture, parallel and distributed computing, and storage systems
2 papers
Cloud and datacenter computing · 72% Parallel and multicore computing · 22% Distributed systems · 6%

Topics — the 6 heaviest of 6, each with the papers that count most for it

TopicWeightPapersLastEvidence papers
Cloud and datacenter computing
job scheduling
0.122008
A two-level scheduler to dynamically schedule a stream of batch jobs in large-scale grids · HPDC 2008
A job scheduling framework for large computing farms · SC 2007
Parallel and multicore computing › task scheduling › process scheduling
two-level scheduling
0.112008
A two-level scheduler to dynamically schedule a stream of batch jobs in large-scale grids · HPDC 2008
Cloud and datacenter computing › job scheduling
batch scheduling
0.112007
A job scheduling framework for large computing farms · SC 2007
Cloud and datacenter computing
cluster resource management and scheduling
0.112007
A job scheduling framework for large computing farms · SC 2007
Distributed systems
grid computing
0.012008
A two-level scheduler to dynamically schedule a stream of batch jobs in large-scale grids · HPDC 2008
Cloud and datacenter computing
resource management
0.012008
A two-level scheduler to dynamically schedule a stream of batch jobs in large-scale grids · HPDC 2008

Methods — techniques the papers use, named apart from their topics

online scheduling · 0.1earliest deadline first · 0.1backfilling · 0.1
YearPublicationVenuePosition
2011 A multi-level scheduler for batch jobs on grids
Marco Pasquali, Ranieri Baraglia, Gabriele Capannini, Laura Ricci, Domenico Laforenza
J. Supercomput.1
2008 A two-level scheduler to dynamically schedule a stream of batch jobs in large-scale grids
abstract
This paper describes the study conducted to design and evaluate a two-level on-line scheduler to dynamically schedule a stream of sequential and multi-threaded batch jobs on large scale grids, made up of interconnected clusters of heterogeneous machines. The scheduler aims to schedule arriving jobs respecting their computational and deadline requirements, and optimizing the utilization of hardware resources as well as software resources.
Marco Pasquali, Ranieri Baraglia, Gabriele Capannini, Laura Ricci, Domenico Laforenza
HPDC1
2007 A job scheduling framework for large computing farms
abstract
In this paper, we propose a new method, called Convergent Scheduling, for scheduling a continuous stream of batch jobs on the machines of large-scale computing farms. This method exploits a set of heuristics that guide the scheduler in making decisions. Each heuristics manages a specific problem constraint, and contributes to carry out a value that measures the degree of matching between a job and a machine. Scheduling choices are taken to meet the QoS requested by the submitted jobs, and optimizing the usage of hardware and software resources. We compared it with some of the most common job scheduling algorithms, i.e. Backfilling, and Earliest Deadline First. Convergent Scheduling is able to compute good assignments, while being a simple and modular algorithm.
Gabriele Capannini, Ranieri Baraglia, Diego Puppin, Laura Ricci, Marco Pasquali
SC5