Demonstration venue · read-only. Every page can be browsed; the buttons that would change it are switched off. Create an account to run TaxoReview on your own data. A simulation from public publication records: the people listed were not invited and did not agree to review.
? Tutorial for this page

Alessandro Agnetis

dblp:63/5317 · DBLP profile ↗
← Back
12ranked-venue papers
10as first author
0since 2021 · last 2017
0000-0001-5803-0438ORCID · verified

Domains — the database's venue-derived domains; a paper can count in several

Theory of computation · 5 · 5 first-authorArtificial intelligence and machine learning · 3 · 2 first-authorSystems, architecture and hardware · 2 · 2 first-authorComputer networks · 2 · 1 first-authorApplied, interdisciplinary, general and emerging computing · 2 · 2 first-authorDatabases, data management, data science and information retrieval · 1 · 1 first-author

Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.

Theoretical computer science
2 papers
Mathematical optimization · 64% Algorithms and data structures · 36%

Topics — the 3 heaviest of 3, each with the papers that count most for it

TopicWeightPapersLastEvidence papers
Algorithms and data structures
dynamic programming
0.011992
Task assignment in pipeline assembly systems · ICRA 1992
Mathematical optimization
discrete optimization
0.011991
Tool handling synchronization in flexible manufacturing cells · ICRA 1991
Mathematical optimization › scheduling
scheduling optimization
0.011991
Tool handling synchronization in flexible manufacturing cells · ICRA 1991

Methods — techniques the papers use, named apart from their topics

polynomial-time algorithm · 0.0dynamic programming · 0.0synchronization · 0.0optimization modeling · 0.0
YearPublicationVenuePosition
2017 Finding a Nash equilibrium and an optimal sharing policy for multiagent network expansion game
abstract
In this work, a multiagent network flow problem is addressed, aiming at characterizing the properties of stable flows and allowing their computation. Two types of agents are considered:transportation‐agents, that carry a flow of products on a given network and another agent, either aproduceror acustomer, who is willing to ship (receive, respectively), products. Every transportation‐agent controls a set of arcs, each having a capacity that can be increased up to a certain point at a given cost. The other agent (i.e., the customer/producer) is interested in maximizing the flow transshipped through the network. To this aim, we assume it offers the transportation‐agents a reward that is proportional to the realized flow value. This particular multiagent framework is referred to as a Multiagent network expansion game. We characterize and find particular stable strategies (i.e., Nash equilibria) that are of interest for this game. We particularly focus on the problem of finding a Nash Equilibrium and a sharing policy that maximize the value of the total flow. We prove that this problem is NP‐hard in the strong sense and show how such a strategy can be characterized considering paths in specific auxiliary graphs. We also provide a mixed integer linear programming formulation to solve the problem. Computational experiments are provided to prove the effectiveness of our approach and derive some insights for practitioners. © 2016 Wiley Periodicals, Inc. NETWORKS, Vol. 69(1), 94–109 2017
Nadia Chaabane Fakhfakh, Cyrille Briand, Marie-José Huguet, Alessandro Agnetis
Networks4
2016 Fixed-sequence Single Machine Scheduling and Outbound Delivery Problems
abstract
In this paper, we study an integrated production an outbound delivery scheduling problem with a predefined sequence. The manufacturer has to process a set of jobs on a single machine and deliver them in batches to multiple customers. A single vehicle with limited capacity is used for the delivery. Each job has a processing time and a specific customer location. Starting from the manufacturer location, the vehicle delivers a set of jobs which constitute a batch by taking into account the transportation times. Since the production sequence and delivery sequence are fixed and identical, the problem consists in deciding the composition of batches. We prove that for any regular sum-type objective function of the delivery times, the problem in NP-hard in the ordinary sense and can be solved in pseudopolynomial time. A dynamic programming algorithm is proposed.
Azeddine Cheref, Alessandro Agnetis, Christian Artigues, Jean-Charles Billaut
ICORES2
2014 The list scheduling algorithm for scheduling unreliable jobs on two parallel machines
Alessandro Agnetis, Paolo Detti, Marco Pranzo
Discret. Appl. Math.1
2009 Single-Machine Scheduling Problems with Generalized Preemption
abstract
We address a class of single-machine, hard scheduling problems with the objective of minimizing the maximum tardiness. The jobs can be preempted, but whenever a job is started or resumed, there is a recovery interval affecting its progress. Such a feature is motivated by certain application environments and generalizes the usual preemption concept. For three different cases of this problem, we propose a heuristic algorithm, based on the partial enumeration of feasible schedules. A packing formulation solved by means of a column generation approach is used to certify the quality of the heuristic solution. An extensive computational experience shows the effectiveness of the approach on different classes of instances and shows that real-size problems can be solved to optimality in an acceptable amount of time.
Alessandro Agnetis, Arianna Alfieri, Gaia Nicosia
INFORMS J. Comput.1
2006 Supply chain scheduling: Sequence coordination
Alessandro Agnetis, Nicholas G. Hall, Dario Pacciarelli
Discret. Appl. Math.1
2004 An implicit enumeration scheme for the batch selection problem
abstract
Abstract An important problem arising in the management of logistic networks is the following: given a set of activities to be performed, each requiring a set of resources, select the optimal set of resources compatible with the system capacity constraints. This problem is called Batch Selection Problem (BSP) from traditional applications to flexible manufacturing. BSP is known to be NP‐hard, and is also considered a difficult integer programming problem. In fact, polyhedral approaches to BSP suffer from the poor quality of the bound provided by the linear relaxation, even after strengthening. We devise an implicit enumeration scheme that attempts to overcome this difficulty. It is based on a formulation of BSP, which is equivalent to a stable set problem with one side constraint. This allows to exploit the upper bound, not only for pruning subproblems, but also for controlling the number and the quality of the subproblems generated. We show the effectiveness of the approach by an extensive computational experience on real‐sized randomly generated instances. © 2004 Wiley Periodicals, Inc. NETWORKS, Vol. 44(2), 151–159 2004
Alessandro Agnetis, Fabrizio Rossi, Stefano Smriglio
Networks1
2001 A linear algorithm for the Hamiltonian completion number of the line graph of a tree
Alessandro Agnetis, Paolo Detti, Carlo Meloni, Dario Pacciarelli
Inf. Process. Lett.1
1997 Batch Scheduling in a Two-machine Flow Shop with Limited Buffer
Alessandro Agnetis, Dario Pacciarelli, Fabrizio Rossi
Discret. Appl. Math.1
1995 Task assignment and subassembly scheduling in flexible assembly lines
abstract
This paper deals with models for flow management problems in flexible assembly systems (FASs). The system consists of a set of machines that must perform the assembly of a number of parts, possibly of different types. Each part type requires a set of operations; the precedence relations among the operations are specified by an assembly tree. Machines are provided with limited-capacity tool magazines and a finite buffer for holding parts. Each machine can be tooled to perform only a particular subset of the operations required by the whole process. One problem is that of finding a feasible assignment of operations to machines and a feasible schedule of the subassemblies in order to minimize the completion time of all of the parts. In this paper, the problem is analysed as a case of pipelined assembly, i.e., when the FAS is characterized by a serial transportation system (flow line) and there exist a dominating path in the assembly tree. We present polynomial-time dynamic programming algorithms for solving the problem for both single-type and multi-type production.>
Alessandro Agnetis, Fernando Nicolò, Claudio Arbib, Mario Lucertini
IEEE Trans. Robotics Autom.1
1992 Task assignment in pipeline assembly systems
abstract
The authors deal with the problem of part flow management in a class of assembly systems characterized by a serial transportation system connecting the workstations. The system assembles a number of identical units, each requiring a set of operations. Each operation is performed by a workstation and each workstation can perform any operation. The problem consists of assigning the operations to the workstations to maximize some productivity index of the system. Usually, a tree-like precedence relationship exists among the operations (assembly tree). The problem is analyzed for the case in which a dominating path on the assembly tree exists. A polynomial time dynamic programming algorithm is presented for the optimal assignment of operations to workstations.>
Alessandro Agnetis, Fernando Nicolò, Claudio Arbib, Mario Lucertini
ICRA1
1991 Tool handling synchronization in flexible manufacturing cells
abstract
Some optimization models for the problem of tool management in flexible manufacturing cells are presented. The cell considered consists of two machines (working centers) in charge of executing a set of part programs. The tools required by the machining operations are located in a central tool magazine and are moved to the machines by a tool handling system consisting of two shuttles and one robot. The robot picks and places the tools from/in the magazine; each shuttle exchanges the tools with the robot and with the machine. The problem is to synchronize the robot and shuttle moves in order to maximize the cell productivity (minimize the machines' idle time). Two different models are proposed for the situation in which a configuration of tools in the magazine is given and in which a budget for tool purchasing is fixed.>
Alessandro Agnetis, Fernando Nicolò, Mario Lucertini
ICRA1
1990 Part routing in flexible assembly systems
abstract
The problem of part routing and scheduling in flexible manufacturing systems is considered with the goal of increasing the throughput. The flexible system considered is strongly characterized by the inclusion of assembly among the manufacturing operations to be performed on a mix of part batches. In particular, the logic structure of some basic decision problems is indicated through a set of combinatorial models. Two basic assembly problems characterized by batches of large and small size, respectively, are analyzed.>
Alessandro Agnetis, Claudio Arbib, Mario Lucertini, Fernando Nicolò
IEEE Trans. Robotics Autom.1