EDBT 2026 Demo / reviewers in the wild / expert
Philippe Laborie
dblp:64/37
· DBLP profile ↗
11ranked-venue papers
8as first author
0since 2021 · last 2018
0000-0002-4045-8601ORCID · corroborated
Domains — the database's venue-derived domains; a paper can count in several
Artificial intelligence and machine learning · 11 · 8 first-authorGraphics, computer vision, multimedia, augmented reality and games · 5 · 4 first-author
Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.
| Artificial intelligence
4 papers |
Planning, search and constraint satisfaction · 100% | |
| Computer architecture, parallel and distributed computing, and storage systems
1 paper |
Electronic design automation · 100% |
Topics — the 7 heaviest of 9, each with the papers that count most for it
| Topic | Weight | Papers | Last | Evidence papers |
|---|---|---|---|---|
Electronic design automation › high-level synthesis
scheduling |
0.1 | 1 | 2007 | A General Framework for Scheduling in a Stochastic Environment · IJCAI 2007 |
Electronic design automation › high-level synthesis › scheduling
stochastic scheduling |
0.1 | 1 | 2007 | A General Framework for Scheduling in a Stochastic Environment · IJCAI 2007 |
Knowledge, reasoning and agents › Planning, search and constraint satisfaction › scheduling
resource-constrained project scheduling |
0.1 | 1 | 2005 | Complete MCS-Based Search: Application to Resource Constrained Project Scheduling · IJCAI 2005 |
Knowledge, reasoning and agents › Planning, search and constraint satisfaction
constraint propagation |
0.0 | 1 | 2003 | Algorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new results · Artif. Intell. 2003 |
Knowledge, reasoning and agents › Planning, search and constraint satisfaction › scheduling
resource-constrained scheduling |
0.0 | 1 | 2003 | Algorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new results · Artif. Intell. 2003 |
Knowledge, reasoning and agents › Planning, search and constraint satisfaction
temporal network |
0.0 | 1 | 2003 | Resource Temporal Networks: Definition and Complexity · IJCAI 2003 |
Knowledge, reasoning and agents › Planning, search and constraint satisfaction › planning › constraint-based planning
resource-constrained planning |
0.0 | 1 | 1995 | Planning with Sharable Resource Constraints · IJCAI 1995 |
Methods — techniques the papers use, named apart from their topics
stochastic scheduling · 0.1constraint propagation · 0.0
| Year | Publication | Venue | Position |
|---|---|---|---|
| 2018 | Objective Landscapes for Constraint Programming
Philippe Laborie |
CPAIOR | 1 |
| 2018 | An Update on the Comparison of MIP, CP and Hybrid Approaches for Mixed Resource Allocation and Scheduling
Philippe Laborie |
CPAIOR | 1 |
| 2015 | A Time-Dependent No-Overlap Constraint: Application to Urban Delivery Problems
Penélope Aguiar-Melgarejo, Philippe Laborie, Christine Solnon |
CPAIOR | 2 |
| 2015 | Failure-Directed Search for Constraint-Based Scheduling
Petr Vilím, Philippe Laborie, Paul Shaw |
CPAIOR | 2 |
| 2014 | An Optimal Iterative Algorithm for Extracting MUCs in a Black-box Constraint NetworkabstractWe present a non-intrusive iterative algorithm for extracting Minimal Unsatisfiable Cores in black-box constraint networks. The problem can be generalized as the one of finding a minimal subset satisfying an upward-closed property P. If performance is measured as the number of infeasibility property checks, we show that the proposed algorithm, ADEL, is optimal both for small and for large MUCs and that it consistently outperforms existing approaches in between those two extremal cases. Philippe Laborie |
ECAI | 1 |
| 2009 | IBM ILOG CP Optimizer for Detailed Scheduling Illustrated on Three Problems
Philippe Laborie |
CPAIOR | 1 |
| 2007 | A General Framework for Scheduling in a Stochastic Environment
Julien Bidot, Thierry Vidal, Philippe Laborie, J. Christopher Beck |
IJCAI | 3 |
| 2005 | Complete MCS-Based Search: Application to Resource Constrained Project Scheduling
Philippe Laborie |
IJCAI | 1 |
| 2003 | Resource Temporal Networks: Definition and Complexity
Philippe Laborie |
IJCAI | 1 |
| 2003 | Algorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new results
Philippe Laborie |
Artif. Intell. | 1 |
| 1995 | Planning with Sharable Resource Constraints
Philippe Laborie, Malik Ghallab |
IJCAI | 1 |