EDBT 2026 Demo / reviewers in the wild / expert
James Hughes 0001
dblp:74/4937
· DBLP profile ↗
1ranked-venue papers
0as first author
0since 2021 · last 1994
—ORCID · none
Domains — the database's venue-derived domains; a paper can count in several
Artificial intelligence and machine learning · 1Systems, architecture and hardware · 1
Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.
| Artificial intelligence
1 paper |
Planning, search and constraint satisfaction · 100% | |
| Interdisciplinary, comprehensive, and emerging computing
1 paper |
Smart cities and intelligent transportation · 100% | |
| Computer architecture, parallel and distributed computing, and storage systems
1 paper |
Electronic design automation · 50% Embedded and real-time systems · 50% |
Topics — the 5 heaviest of 5, each with the papers that count most for it
| Topic | Weight | Papers | Last | Evidence papers |
|---|---|---|---|---|
Knowledge, reasoning and agents › Planning, search and constraint satisfaction › scheduling
job shop scheduling |
0.0 | 1 | 1994 | Integrating AGV Schedules in a Scheduling System for a Flexible Manufacturing Environment · ICRA 1994 |
Knowledge, reasoning and agents › Planning, search and constraint satisfaction
scheduling |
0.0 | 1 | 1994 | Integrating AGV Schedules in a Scheduling System for a Flexible Manufacturing Environment · ICRA 1994 |
Smart cities and intelligent transportation
automated guided vehicle |
0.0 | 1 | 1994 | Integrating AGV Schedules in a Scheduling System for a Flexible Manufacturing Environment · ICRA 1994 |
Embedded and real-time systems › real-time scheduling
heuristic scheduling |
0.0 | 1 | 1994 | Integrating AGV Schedules in a Scheduling System for a Flexible Manufacturing Environment · ICRA 1994 |
Electronic design automation › high-level synthesis
scheduling |
0.0 | 1 | 1994 | Integrating AGV Schedules in a Scheduling System for a Flexible Manufacturing Environment · ICRA 1994 |
Methods — techniques the papers use, named apart from their topics
heuristic modules · 0.0
| Year | Publication | Venue | Position |
|---|---|---|---|
| 1994 | Integrating AGV Schedules in a Scheduling System for a Flexible Manufacturing EnvironmentabstractIn a job shop where machining time takes a comparable amount as material transportation time, it is no longer realistic to ignore the scheduling of material transportation systems such as automated guided vehicles (AGVs). The authors' algorithm discussed in this paper integrates AGV schedules into a heuristic-based scheduling algorithm to achieve the maximum amount of flexibility and optimization for a flexible manufacturing environment. Furthermore in order to allow their system to achieve different optimization goals such as shortest schedules or schedules that require the minimum computation time, the authors' system architecture consists of individual modules of heuristics so that one or any combination of these modules can be used. The authors then discuss how they control the use of these heuristic modules to achieve the best results with some experimental data.> Pearl Pu, James Hughes 0001 |
ICRA | 2 |