Demonstration venue · read-only. Every page can be browsed; the buttons that would change it are switched off. Create an account to run TaxoReview on your own data.

James Hughes 0001

dblp:74/4937 · DBLP profile ↗
← Back
1ranked-venue papers
0as first author
0since 2021 · last 1994
—ORCID · none

Domains — the database's venue-derived domains; a paper can count in several

Artificial intelligence and machine learning · 1Systems, architecture and hardware · 1

Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.

Artificial intelligence
1 paper
Planning, search and constraint satisfaction · 100%
Interdisciplinary, comprehensive, and emerging computing
1 paper
Smart cities and intelligent transportation · 100%
Computer architecture, parallel and distributed computing, and storage systems
1 paper
Electronic design automation · 50% Embedded and real-time systems · 50%

Topics — the 5 heaviest of 5, each with the papers that count most for it

TopicWeightPapersLastEvidence papers
Knowledge, reasoning and agents › Planning, search and constraint satisfaction › scheduling
job shop scheduling
0.011994
Integrating AGV Schedules in a Scheduling System for a Flexible Manufacturing Environment · ICRA 1994
Knowledge, reasoning and agents › Planning, search and constraint satisfaction
scheduling
0.011994
Integrating AGV Schedules in a Scheduling System for a Flexible Manufacturing Environment · ICRA 1994
Smart cities and intelligent transportation
automated guided vehicle
0.011994
Integrating AGV Schedules in a Scheduling System for a Flexible Manufacturing Environment · ICRA 1994
Embedded and real-time systems › real-time scheduling
heuristic scheduling
0.011994
Integrating AGV Schedules in a Scheduling System for a Flexible Manufacturing Environment · ICRA 1994
Electronic design automation › high-level synthesis
scheduling
0.011994
Integrating AGV Schedules in a Scheduling System for a Flexible Manufacturing Environment · ICRA 1994

Methods — techniques the papers use, named apart from their topics

heuristic modules · 0.0
YearPublicationVenuePosition
1994 Integrating AGV Schedules in a Scheduling System for a Flexible Manufacturing Environment
abstract
In a job shop where machining time takes a comparable amount as material transportation time, it is no longer realistic to ignore the scheduling of material transportation systems such as automated guided vehicles (AGVs). The authors' algorithm discussed in this paper integrates AGV schedules into a heuristic-based scheduling algorithm to achieve the maximum amount of flexibility and optimization for a flexible manufacturing environment. Furthermore in order to allow their system to achieve different optimization goals such as shortest schedules or schedules that require the minimum computation time, the authors' system architecture consists of individual modules of heuristics so that one or any combination of these modules can be used. The authors then discuss how they control the use of these heuristic modules to achieve the best results with some experimental data.>
Pearl Pu, James Hughes 0001
ICRA2