Demo Data from EDBT 2026 / reviewers in the wild / expert
Bryan R. Moser
dblp:85/6053
· DBLP profile ↗
2ranked-venue papers
0as first author
0since 2021 · last 2008
0000-0001-6441-821XORCID · verified
Domains — the database's venue-derived domains; a paper can count in several
Artificial intelligence and machine learning · 1Systems, architecture and hardware · 1Applied, interdisciplinary, general and emerging computing · 1
Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.
| Theoretical computer science
1 paper |
Mathematical optimization · 100% | |
| Computer architecture, parallel and distributed computing, and storage systems
1 paper |
Distributed systems · 100% |
Topics — the 3 heaviest of 3, each with the papers that count most for it
| Topic | Weight | Papers | Last | Evidence papers |
|---|---|---|---|---|
Mathematical optimization
distributed optimization |
0.0 | 1 | 2003 | An optimization-based approach for distributed project scheduling · ICRA 2003 |
Mathematical optimization › scheduling › precedence constrained scheduling
project scheduling |
0.0 | 1 | 2003 | An optimization-based approach for distributed project scheduling · ICRA 2003 |
Distributed systems
distributed coordination |
0.0 | 1 | 2003 | An optimization-based approach for distributed project scheduling · ICRA 2003 |
Methods — techniques the papers use, named apart from their topics
surrogate subgradient method · 0.1lagrangian relaxation · 0.1dynamic programming · 0.1
| Year | Publication | Venue | Position |
|---|---|---|---|
| 2008 | An Optimization-Based Approach for Design Project SchedulingabstractConcurrent engineering has been widely used in managing design projects to speed up the design process by concurrently performing multiple tasks. Since the progress of a design task often depends on the knowledge about other tasks and requires effective communication, tasks and communication activities need to be properly coordinated to avoid delays caused by waiting for information or the need for rework. This paper presents a novel formulation for design project scheduling with explicit modeling of task dependencies and the associated communication activities. General dependencies are modeled as combinations of three basic types representing sequential, concurrent, and independent processes. Communication activities are also modeled as tasks, and their interactions with design tasks are described by sets of intertask constraints. The objective is to achieve timely project completion with limited resources. To improve algorithm convergence and schedule quality, penalties on the violation of constraints coupling design tasks are added to the objective function. A solution methodology that combines Lagrangian relaxation, dynamic programming, and heuristic is developed to schedule design and communication tasks, and a surrogate optimization framework is used to overcome the ldquoinseperabilityrdquo caused by nonadditive penalties. A heuristic procedure is then developed to obtain scheduling policies from optimization results and to dynamically construct schedules. Numerical results show that the approach is effective to handle various task dependencies and the associated communication activities to provide high-quality schedules. Peter B. Luh, Bryan R. Moser |
IEEE Trans Autom. Sci. Eng. | 3 |
| 2003 | An optimization-based approach for distributed project schedulingabstractPressed by market globalization, a recent trend for manufacturers is to have their design teams at different locations to better serve local markets and reduce design costs. Under the concurrent engineering paradigm, tasks in a design project are required to be performed in parallel, however, are often interdependent in a complex way. As a result, effective communication and coordination among teams become vital for a project to be successful. The complex interdependencies have not been adequately addressed in the literature. This paper presents a novel optimization formulation that explicitly models the interdependencies among tasks and the communication activities required. A solution methodology that combines Lagrangian relaxation and the surrogate subgradient method has been developed to solve the optimization problem that is inseparable. Backward/forward Dynamic programming is used to solve task subproblems. Numerical results demonstrate that complex dependencies among tasks are satisfied via communication activities, and near-optimal schedules are efficiently obtained. Peter B. Luh, Bryan R. Moser |
ICRA | 3 |