Demo Data from EDBT 2026 / reviewers in the wild / expert
Guillaume Infantes
dblp:87/2136
· DBLP profile ↗
13ranked-venue papers
3as first author
2since 2021 · last 2025
0000-0001-8940-2433ORCID · verified
Domains — the database's venue-derived domains; a paper can count in several
Artificial intelligence and machine learning · 12 · 3 first-author · 2 since 2021Graphics, computer vision, multimedia, augmented reality and games · 7 · 1 first-authorSystems, architecture and hardware · 1Databases, data management, data science and information retrieval · 1Human-computer interaction and ubiquitous computing · 1Applied, interdisciplinary, general and emerging computing · 1
Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.
| Artificial intelligence
6 papers |
Planning, search and constraint satisfaction · 55% Motion planning and robot control · 33% Knowledge representation and reasoning · 8% | |
| Databases, data mining, and information retrieval
1 paper |
Data models and query languages · 33% Query processing and optimization · 33% Data integration and cleaning · 33% |
Topics — the 17 heaviest of 19, each with the papers that count most for it
| Topic | Weight | Papers | Last | Evidence papers |
|---|---|---|---|---|
Robotics › Motion planning and robot control › robot control
open-loop control |
0.3 | 1 | 2018 | Open Loop Execution of Tree-Search Algorithms · IJCAI 2018 |
Knowledge, reasoning and agents › Planning, search and constraint satisfaction
search-based planning |
0.3 | 1 | 2018 | Open Loop Execution of Tree-Search Algorithms · IJCAI 2018 |
Knowledge, reasoning and agents › Planning, search and constraint satisfaction
heuristic search |
0.2 | 1 | 2013 | Problem Splitting Using Heuristic Search in Landmark Orderings · IJCAI 2013 |
Knowledge, reasoning and agents › Planning, search and constraint satisfaction
problem decomposition |
0.2 | 1 | 2013 | Problem Splitting Using Heuristic Search in Landmark Orderings · IJCAI 2013 |
Robotics › Motion planning and robot control › motion planning
anytime planning |
0.1 | 1 | 2011 | A generic framework for anytime execution-driven planning in robotics · ICRA 2011 |
Knowledge, reasoning and agents › Planning, search and constraint satisfaction
classical planning |
0.1 | 1 | 2011 | Extending Classical Planning Heuristics to Probabilistic Planning with Dead-Ends · AAAI 2011 |
Knowledge, reasoning and agents › Planning, search and constraint satisfaction › planning under uncertainty › probabilistic planning
markov decision process planning |
0.1 | 1 | 2011 | Extending Classical Planning Heuristics to Probabilistic Planning with Dead-Ends · AAAI 2011 |
Knowledge, reasoning and agents › Planning, search and constraint satisfaction › heuristic search
planning heuristics |
0.1 | 1 | 2011 | Extending Classical Planning Heuristics to Probabilistic Planning with Dead-Ends · AAAI 2011 |
Knowledge, reasoning and agents › Planning, search and constraint satisfaction › planning under uncertainty
probabilistic planning |
0.1 | 1 | 2011 | Extending Classical Planning Heuristics to Probabilistic Planning with Dead-Ends · AAAI 2011 |
Robotics › Motion planning and robot control › robot control › behavior-based control
reactive behavior |
0.1 | 1 | 2011 | A generic framework for anytime execution-driven planning in robotics · ICRA 2011 |
Robotics › Motion planning and robot control
robot control |
0.1 | 1 | 2011 | A generic framework for anytime execution-driven planning in robotics · ICRA 2011 |
Data integration and cleaning › data quality
inconsistency detection |
0.1 | 1 | 2009 | SPOT Databases: Efficient Consistency Checking and Optimistic Selection in Probabilistic Spatial Databases · IEEE Trans. Knowl. Data Eng. 2009 |
Data models and query languages › uncertain data management
probabilistic spatial databases |
0.1 | 1 | 2009 | SPOT Databases: Efficient Consistency Checking and Optimistic Selection in Probabilistic Spatial Databases · IEEE Trans. Knowl. Data Eng. 2009 |
Query processing and optimization › query execution › relational operators
selection operator |
0.1 | 1 | 2009 | SPOT Databases: Efficient Consistency Checking and Optimistic Selection in Probabilistic Spatial Databases · IEEE Trans. Knowl. Data Eng. 2009 |
Knowledge, reasoning and agents › Knowledge representation and reasoning
belief revision |
0.1 | 1 | 2008 | An AGM-Based Belief Revision Mechanism for Probabilistic Spatio-Temporal Logics · AAAI 2008 |
Knowledge, reasoning and agents › Knowledge representation and reasoning › temporal reasoning
spatio-temporal reasoning |
0.1 | 1 | 2008 | An AGM-Based Belief Revision Mechanism for Probabilistic Spatio-Temporal Logics · AAAI 2008 |
Machine learning › Probabilistic and Bayesian machine learning › structured models › latent variable model
hidden markov model |
0.0 | 1 | 2006 | Robot introspection through learned hidden Markov models · Artif. Intell. 2006 |
Methods — techniques the papers use, named apart from their topics
stochastic planning · 0.3monte carlo tree search · 0.3modular architecture · 0.1hmax · 0.1hadd · 0.1domain determinization · 0.1LRTDP · 0.1LDFS · 0.1LAO* · 0.1search space pruning · 0.1linear programming · 0.1indexing · 0.1AGM postulates · 0.1
| Year | Publication | Venue | Position |
|---|---|---|---|
| 2025 | Learning to Solve Resource-Constrained Project Scheduling Problems with Duration Uncertainty Using Graph Neural NetworksabstractThe Resource-Constrained Project Scheduling Problem (RCPSP) is a classical scheduling problem that has received significant attention due to of its numerous applications in industry. However, in practice, task durations are subject to uncertainty that must be considered in order to propose resilient scheduling. In this paper, we address the RCPSP variant with uncertain tasks duration (modeled using known probabilities) and aim to minimize the overall expected project duration. Our objective is to produce a baseline schedule that can be reused multiple times in an industrial setting regardless of the actual duration scenario. We leverage Graph Neural Networks in conjunction with Deep Reinforcement Learning (DRL) to develop an effective policy for task scheduling. This policy operates similarly to a priority dispatch rule and is paired with a Serial Schedule Generation Scheme to produce a schedule. Our empirical evaluation on standard benchmarks demonstrates the approach's superiority in terms of performance and its ability to generalize. The developed framework, Wheatley, is made publicly available online to facilitate further research and reproducibility. Guillaume Infantes, Stéphanie Roussel 0001, Antoine Jacquet, Emmanuel Benazera |
ICTAI | 1 |
| 2024 | Learning to Solve Job Shop Scheduling Under Uncertainty
Guillaume Infantes, Stéphanie Roussel 0001, Pierre Pereira, Antoine Jacquet, Emmanuel Benazera |
CPAIOR (1) | 1 |
| 2018 | Open Loop Execution of Tree-Search AlgorithmsabstractIn the context of tree-search stochastic planning algorithms where a generative model is available, we consider on-line planning algorithms building trees in order to recommend an action. We investigate the question of avoiding re-planning in subsequent decision steps by directly using sub-trees as action recommender. Firstly, we propose a method for open loop control via a new algorithm taking the decision of re-planning or not at each time step based on an analysis of the statistics of the sub-tree. Secondly, we show that the probability of selecting a suboptimal action at any depth of the tree can be upper bounded and converges towards zero. Moreover, this upper bound decays in a logarithmic way between subsequent depths. This leads to a distinction between node-wise optimality and state-wise optimality. Finally, we empirically demonstrate that our method achieves a compromise between loss of performance and computational gain. Erwan Lecarpentier, Guillaume Infantes, Charles Lesire, Emmanuel Rachelson |
IJCAI | 2 |
| 2013 | Problem Splitting Using Heuristic Search in Landmark Orderings
Simon Vernhes, Guillaume Infantes, Vincent Vidal 0001 |
IJCAI | 2 |
| 2011 | Extending Classical Planning Heuristics to Probabilistic Planning with Dead-EndsabstractRecent domain-determinization techniques have been very successful in many probabilistic planning problems. We claim that traditional heuristic MDP algorithms have been unsuccessful due mostly to the lack of efficient heuristics in structured domains. Previous attempts like mGPT used classical planning heuristics to an all-outcome determinization of MDPs without discount factor; yet, discounted optimization is required to solve problems with potential dead-ends. We propose a general extension of classical planning heuristics to goal-oriented discounted MDPs, in order to overcome this flaw. We apply our theoretical analysis to the well-known classical planning heuristics Hmax and Hadd, and prove that the extended Hmax is admissible. We plugged our extended heuristics to popular graph-based (Improved-LAO*, LRTDP, LDFS) and ADD-based (sLAO*, sRTDP) MDP algorithms: experimental evaluations highlight competitive results compared with the winners of previous competitions (FF-Replan, FPG, RFF), and show that our discounted heuristics solve more problems than non-discounted ones, with better criteria values. As for classical planning, the extended Hadd outperforms the extended Hmax on most problems. Florent Teichteil-Königsbuch, Vincent Vidal 0001, Guillaume Infantes |
AAAI | 3 |
| 2011 | A generic framework for anytime execution-driven planning in roboticsabstractRobotic missions require to implement various functionalities in order to link reactive functions at actuators and sensors level to deliberative functions like vision, supervision and planning at decisional level. All these functionalities must be versatile and generic enough to interact differently according to the missions while minimizing recoding effort. Moreover, deliberative functions like automated planning consume lots of memory and CPU time and usually complete in time incompatible with robotic missions' durations. Thus, we present a new generic and anytime planning concept for modular robotic architectures, which manages multiple planning requests at a time, solved in background, while allowing for reactive execution of planned actions at the same time. Different planners based on various formalisms and data structures can be plugged to the planning component without changing its behavior nor its code, facilitating reusability and validation of the component. We highlight the versatility of our concept on different use cases; then we demonstrate the efficiency of our approach in terms of mission duration and success, compared with traditional plan-then-execute approaches; we finally present a search and rescue mission by an autonomous rotorcraft solved with our paradigm, that cannot be tackled by traditional approaches. Florent Teichteil-Königsbuch, Charles Lesire, Guillaume Infantes |
ICRA | 3 |
| 2010 | Constraint-Based Controller Synthesis in Non-Deterministic and Partially Observable DomainsabstractController synthesis consists in automatically building controllers taking as inputs observation data and returning outputs guaranteeing that the controlled system satisfies some desired properties. In system specification, these properties may be safety properties specifying that some conditions must always hold. In planning, they express that the evolution of the controlled system must terminate in a goal state. In this paper, we propose a generic approach able to synthesize memoryless or finite-memory controllers for both safety-oriented and goal-oriented control problems. This approach relaxes some restrictive assumptions made by existing work on controller synthesis with non-determinism and partial observability and is shown to induce potentially significant gains. The proposed “Simulate and Branch” algorithm consists in exploring the possible evolutions of the controlled system and in adding new control elements when uncovered states are discovered. The approach developed is constraint-based in the sense that control problems are formulated using the flexibility of constraint programming languages and that our implementation uses the Gecode constraint programming library. Cédric Pralet, Gérard Verfaillie, Michel Lemaître, Guillaume Infantes |
ECAI | 4 |
| 2009 | SPOT Databases: Efficient Consistency Checking and Optimistic Selection in Probabilistic Spatial DatabasesabstractSpatial probabilistic temporal (SPOT) databases are a paradigm for reasoning with probabilistic statements about where a vehicle may be now or in the future. They express statements of the form "Object O is in spatial region R at some time t with some probability in the interval [L,U]." Past work on SPOT databases has developed selection operators based on selecting SPOT atoms that are entailed by the SPOT database-we call this "cautious" selection. In this paper, we study several problems. First, we note that the runtime of consistency checking and cautious selection algorithms in past work is influenced greatly by the granularity of the underlying Cartesian space. In this paper, we first introduce the notion of "optimistic" selection, where we are interested in returning all SPOT atoms in a database that are consistent with respect to a query, rather than having an entailment relationship. We then develop an approach to scaling SPOT databases that has three main contributions: 1) We develop methods to eliminate variables from the linear programs used in past work, thus greatly reducing the size of the linear programs used-the resulting advances apply to consistency checking, optimistic selection, and cautious selection. 2) We develop a host of theorems to show how we can prune the search space when we are interested in optimistic selection. 3) We use the above contributions to build an efficient index to execute optimistic selection queries over SPOT databases. Our approach is superior to past work in two major respects: First, it makes fewer assumptions than all past works on this topic except that in. Second, our experiments, which are based on real-world data about ship movements, show that our algorithms are much more efficient than those in. Austin Parker, Guillaume Infantes, John Grant, V. S. Subrahmanian |
IEEE Trans. Knowl. Data Eng. | 2 |
| 2008 | An AGM-Based Belief Revision Mechanism for Probabilistic Spatio-Temporal Logics
Austin Parker, Guillaume Infantes, V. S. Subrahmanian, John Grant |
AAAI | 2 |
| 2006 | Learning Behaviors Models for Robot Execution Control
Guillaume Infantes, Félix Ingrand, Malik Ghallab |
ECAI | 1 |
| 2006 | Rackham: An Interactive Robot-GuideabstractRackham is an interactive robot-guide that has been used in several places and exhibitions. This paper presents its design and reports on results that have been obtained after its deployment in a permanent exhibition. The project is conducted so as to incrementally enhance the robot functional and decisional capabilities based on the observation of the interaction between the public and the robot. Besides robustness and efficiency in the robot navigation abilities in a dynamic environment, our focus was to develop and test a methodology to integrate human-robot interaction abilities in a systematic way. We first present the robot and some of its key design issues. Then, we discuss a number of lessons that we have drawn from its use in interaction with the public and how that will serve to refine our design choices and to enhance robot efficiency and acceptability Aurélie Clodic, Sara Fleury, Rachid Alami 0001, Raja Chatila 0001, Gérard Bailly, Ludovic Brethes, Maxime Cottret, Patrick Danès, Xavier Dollat, Frédéric Elisei, Isabelle Ferrané, Matthieu Herrb, Guillaume Infantes, Christian Lemaire, Frédéric Lerasle, Jérôme Manhes, Patrick Marcoul, Paulo Menezes 0001, Vincent Montreuil |
RO-MAN | 13 |
| 2006 | Robot introspection through learned hidden Markov models
Maria Fox 0001, Malik Ghallab, Guillaume Infantes, Derek Long |
Artif. Intell. | 3 |
| 2004 | Robel: Synthesizing and Conrolling Complex Robust Robot Behaviors
Benoit Morisset, Guillaume Infantes, Malik Ghallab, Félix Ingrand |
ECAI | 2 |