Demonstration venue · read-only. Every page can be browsed; the buttons that would change it are switched off. Create an account to run TaxoReview on your own data. A simulation from public publication records: the people listed were not invited and did not agree to review.
? Tutorial for this page

D. Quelhadj

dblp:90/2576 · DBLP profile ↗
← Back
1ranked-venue papers
1as first author
0since 2021 · last 2003
—ORCID · none

Domains — the database's venue-derived domains; a paper can count in several

Artificial intelligence and machine learning · 1 · 1 first-authorSystems, architecture and hardware · 1 · 1 first-author

Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.

Artificial intelligence
1 paper
Multi-agent systems · 67% Planning, search and constraint satisfaction · 33%
Interdisciplinary, comprehensive, and emerging computing
1 paper
Energy systems and smart grids · 100%

Topics — the 3 heaviest of 4, each with the papers that count most for it

TopicWeightPapersLastEvidence papers
Knowledge, reasoning and agents › Multi-agent systems › distributed scheduling › multi-agent scheduling
agent-based scheduling
0.012003
Utility and Stability Measures for Agent-Based Dynamic Scheduling of Steel Continuous Casting · ICRA 2003
Knowledge, reasoning and agents › Multi-agent systems
dynamic scheduling
0.012003
Utility and Stability Measures for Agent-Based Dynamic Scheduling of Steel Continuous Casting · ICRA 2003
Knowledge, reasoning and agents › Planning, search and constraint satisfaction
scheduling
0.012003
Utility and Stability Measures for Agent-Based Dynamic Scheduling of Steel Continuous Casting · ICRA 2003

Methods — techniques the papers use, named apart from their topics

tabu search · 0.1simulation · 0.1heuristic search · 0.1
YearPublicationVenuePosition
2003 Utility and Stability Measures for Agent-Based Dynamic Scheduling of Steel Continuous Casting
abstract
This paper describes a new model for robust predictive/reactive scheduling of steel continuous casting based on the use of multi-agents, tabu search and heuristic approaches. A continuous caster agent generates a predictive production schedule taking into account manufacturing requirements and local constraints using tabu search. The predictive schedule is modifies so as to minimize deviation between the performance measure values of the realized and predictive schedules in order to react to real-time events. We propose several schedule-repair and complete reschedule strategies to handle the real-time events, evaluate and compare their performance. The decision as to whether to locally repair the schedule or reschedule from scratch (complete reschedule) is based on three measures: robustness, utility and stability. Utility measures the change in schedule objective following schedule revision. Stability measures the deviation from the original schedule caused by schedule revision to quantify the undesirability of making large changes to the initial predictive schedule unless absolutely necessary. Robustness combines the utility and stability measures. In order to investigate the performance of these measures and strategies, simulation experiments were carried out and results are reported.
D. Quelhadj, Peter I. Cowling, Sanja Petrovic
ICRA1