Demonstration venue · read-only. Every page can be browsed; the buttons that would change it are switched off. Create an account to run TaxoReview on your own data. A simulation from public publication records: the people listed were not invited and did not agree to review.
? Tutorial for this page

Jin Sun 0008

dblp:93/1520-8 · DBLP profile ↗
← Back
2ranked-venue papers
2as first author
0since 2021 · last 2010
—ORCID · none

Domains — the database's venue-derived domains; a paper can count in several

Artificial intelligence and machine learning · 1 · 1 first-authorSystems, architecture and hardware · 1 · 1 first-authorApplied, interdisciplinary, general and emerging computing · 1 · 1 first-author

Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.

Theoretical computer science
1 paper
Mathematical optimization · 100%
Computer architecture, parallel and distributed computing, and storage systems
1 paper
Performance modeling and evaluation · 100%

Topics — the 2 heaviest of 2, each with the papers that count most for it

TopicWeightPapersLastEvidence papers
Mathematical optimization › scheduling
scheduling optimization
0.112006
Estimation of Optimal Elevator Scheduling Performance · ICRA 2006
Performance modeling and evaluation
queueing models
0.012006
Estimation of Optimal Elevator Scheduling Performance · ICRA 2006

Methods — techniques the papers use, named apart from their topics

upper and lower bounds · 0.1two-level minimization · 0.1
YearPublicationVenuePosition
2010 Optimization of Group Elevator Scheduling With Advance Information
abstract
Group elevator scheduling has received considerable attention due to its importance to transportation efficiency for mid-rise and high-rise buildings. One important trend to improve elevator systems is to collect advance traffic information. Nevertheless, it remains a challenge to develop new scheduling methods which can effectively utilize such information. This paper is to solve the group elevator scheduling problem with advance traffic information. This problem is difficult due to various traffic patterns, complicated car dynamics, and combinatorial explosion of the search space. A two-level formulation is developed with passenger-to-car assignment at the high-level and single car dispatching that is innovatively formulated as passenger-to-trip assignment at the low-level. Detailed car dynamics are embedded in simulation models for performance evaluation. Taking advantage of advance information, a new door action control method is suggested to increase the flexibility of elevators. In view of the hierarchical problem structure, a two-level optimization framework is established. Key problem characteristics are exploited to develop an effective trip-based heuristic for single car dispatching, and a hybrid nested partitions and genetic algorithm method for passenger-to-car assignment which can be extended to solve a generic class of sequential decision problems. Numerical results demonstrate solution quality, computational efficiency, benefit of advance information and the new door action control method, and values of new features in our hybrid method.
Jin Sun 0008, Qianchuan Zhao, Peter B. Luh
IEEE Trans Autom. Sci. Eng.1
2006 Estimation of Optimal Elevator Scheduling Performance
abstract
Group elevator scheduling is important for transportation efficiency in mid-rise and high-rise buildings, and incessant efforts have been made to improve the service efficiency of elevators. Although these efforts have achieved performance improvements, the performance limit remains an open issue. This paper tries to address that goal by estimating the optimal performance of group elevator scheduling with complete knowledge of future traffic information. A two-level minimization formulation is presented, with passenger-to-car at the high level, and single car dispatching at the low level. The low level is formulated as a passenger-to-trip assignment problem by using a concept trip to facilitate the description of single car dispatching strategies. In view of the difficulty to obtain the absolute optimal performance, our goal turns into its upper and lower bounds. The upper bound is obtained by finding a good feasible solution to this problem. The lower bound is obtained by finding the lower bound for a newly constructed problem whose optimal performance is less than or equal to that of the original problem. Numerical results demonstrate the effectiveness and the scalability of our method
Jin Sun 0008, Qianchuan Zhao, Peter B. Luh, Mikhail J. Atalla
ICRA1