Fabrice Dusonchet

dblp:97/6384 · DBLP profile ↗
← Back
2ranked-venue papers
2as first author
0since 2021 · last 2003
—ORCID · none

Domains — the database's venue-derived domains; a paper can count in several

Systems, architecture and hardware · 1 · 1 first-authorApplied, interdisciplinary, general and emerging computing · 1 · 1 first-author

Expertise — from the expertise taxonomy: the topics of the expert's papers under the CCF categories. A weight counts papers with recency: 1 for a paper about the topic, 0.3 when the topic is its context, halved every five years.

Theoretical computer science
1 paper
Mathematical optimization · 87% Algorithmic game theory and mechanism design · 13%

Topics — the 2 heaviest of 3, each with the papers that count most for it

TopicWeightPapersLastEvidence papers
Mathematical optimization › sequential decision making
restless bandit
0.012003
Continuous-time restless bandit and dynamic scheduling for make-to-stock production · IEEE Trans. Robotics Autom. 2003
Mathematical optimization › scheduling › scheduling under uncertainty
stochastic scheduling
0.012003
Continuous-time restless bandit and dynamic scheduling for make-to-stock production · IEEE Trans. Robotics Autom. 2003

Methods — techniques the papers use, named apart from their topics

whittle relaxation · 0.0gittins index · 0.0discounted cost criterion · 0.0
YearPublicationVenuePosition
2003 Continuous-time restless bandit and dynamic scheduling for make-to-stock production
abstract
We study the "Whittle relaxation" version of the continuous time, discrete, and continuous state space Restless Bandit problem under the discounted cost criterion. Explicit expressions of Whittle's priority indexes, which generalize the Gittins indexes, are derived. This formalism is then used in the context of flexible make-to-stock production to construct dynamic scheduling rules. These analytical results are finally compared with the optimal numerically derived policy, obtained for a server delivering two product types. It is observed that the Whittle relaxation version of the Restless Bandit model nearly yields optimal dynamic scheduling rules.
Fabrice Dusonchet, Max-Olivier Hongler
IEEE Trans. Robotics Autom.1
2001 Dynamic scheduling of a multi-items production operating on a make-to-stock basis
abstract
In the present contribution, we explore the scheduling rules and the hedging levels that can be obtained by using a restless bandit problem formulation of a make-to-stock production.
Fabrice Dusonchet, Max-Olivier Hongler
ETFA (1)1